Don Mills Trail

The Don Mills Trail (also known as the Leaside Spur Trail) is a 3-kilometre (1.9 mi) cycling and walking trail in Toronto, Ontario, Canada. The trail runs south from York Mills Road, east of and roughly parallel to Leslie Street. The city built the trail on the roadbed of a former railway line, known as the Leaside Spur.

Don Mills Trail
a.k.a. Leaside Spur Trail
Bond Avenue entrance to the trail
Length3 km (2 mi)
Locationeast of Leslie Street from Bond Park to just north of Eglinton Avenue East
TrailheadsTo York Mills Road[1] and 1 km south of Overland Drive
Usecycling and walking
Hiking details
SeasonYear-round
WebsiteDon Mills Trail

The trail is situated within the Don Mills neighbourhood[2] of Toronto. None of the trail is within Leaside,[3] although that was the destination of trains that used the former Leaside Spur. The Don Mills Trail is not to be confused with the Lower Don Trail,[4] also within Toronto.

Description

The trail starts at the intersection of York Mills Road and Scarsdale Road and ends in a dead-end about 1.1 kilometres (0.68 mi) south of Overland Drive.[5] Most of the trail runs between residential areas while the southern portion is bordered by industrial and commercial properties, following the roadbed of a former railway line.[6][7] At the north end, just south of the bridge at York Mills Road, the trail runs parallel to the still-active tracks of the Canadian National Railway (CNR) Bala Division. At the south end, the trail stops a short distance from the tracks of the Canadian Pacific Railway (CPR) Belleville Subdivision, which are fenced off from the trail.[5][6]

There are ornamental circles in the pavement where the trail intersects a street or a cross-trail, including circles at Talwood Park, Lawrence Avenue East (north and south side) and Overland Drive. Some of the circles contain two embedded parallel rails as a reminder of the trail's railway legacy. In or near the circles there are ornamental bike parking stands. The circles at Talwood Park and Overland Drive each have park benches and a pair of cyclist barriers to force cross bicycle traffic to ride around the circle.[8] The circles at the Lawrence Avenue crossing have seating walls around parts of each circle's circumference, with one wall of each circle bearing the name of the trail. There are traffic signals where the trail crosses Lawrence Avenue.[9]

History

Rail

Warehouse siding once served by the Leaside Spur (2017 photo)

The trail uses the 100-foot-wide (30 m) roadbed of the Leaside Spur (also known as the Leaside Cutoff and the Oriole Spur), a former railway line that connected Oriole on the CNR Bala Subdivision with Donlands on the CPR Belleville Subdivision. (Oriole is at York Mills Road, and Donlands is about 450 metres north of Eglinton Avenue East.) The Canadian Northern Railway (CNoR) built the line originally to access the CPR North Toronto Station. (However, CNoR/CNR passenger service to North Toronto Station never occurred.[10]) The Leaside Spur opened on February 1, 1918; it was 2.18 mi (3.51 km) long. The CNR purchased the spur in 1918 after the CNoR became financially insolvent.[11]

The Leslie Spur provided access to the CNoR's shop complex at Leaside, which included a roundhouse, a large locomotive shop, a passenger coach shop and other buildings. The complex replaced an engine house in the Don Valley at Rosedale that had limited capacity and was vulnerable to flooding. CNoR trains from downtown to Leaside needed to go north through the Don Valley to Oriole then south on the Leaside Spur. The Leaside locomotive shop opened in 1919, and there was a transfer table between it and the passenger coach shop. With the merger of the CNoR into the CNR, the complex became redundant and was closed in the 1930s.[10][12] The locomotive shop survives today, and is occupied by Longo's Leaside supermarket on Laird Drive.[13]

The CNR used the Leaside Spur to interchange freight with the CPR[11] and to serve local industries at Leaside using a small yard there. The CNR once had running rights to switch industries on the north side of the CPR midtown line all the way to the TTC's Hillcrest Complex at Bathurst Street.[10] There also used to be a few sidings serving industries along the spur, including one with much of its track still in place as of 2017.[6] See photo.

The CNR abandoned the spur in 1999.[11]

In April 2009, the Province of Ontario purchased the Don Branch (running between downtown Toronto and Leaside). GO Transit was considering rerouting its Richmond Hill line trains over the Don Branch and the Leaside Spur in order to avoid the Bala division south of Oriole which is vulnerable to Don River flooding. The idea was dropped when the City of Toronto purchased it for a key link in the bike trail network, now the Don Mills Trail.[14]

There was one bridge on the Leaside Spur over Bond Avenue; it took 6 years to construct between 1912 and 1918. The abutments are concrete slabs 9.5 ft (2.9 m) high. Six 2-foot-thick (0.61 m) beams span the 15-foot-wide (4.6 m) opening, spaced to handle the weight of locomotives and heavily loaded railcars. Sitting on the steel beams were twenty-one 8×8-inch (20×20 cm) railway ties, spaced 4 in (10 cm) apart for drainage. The bridge is now used by the Don Mills Trail. [11]

Trail

The City of Toronto purchased the right-of-way of the Leaside Spur in late 2001.[11] By 2010, the City of Toronto was holding public sessions for the design of the trail.[8]

Because of its deteriorating condition, the bridge over Bond Avenue was threatened with demolition in 2011. Local residents pushed to give it a heritage designation in order to preserve it.[11][15]

By October 2011, the paving of the trail and the installation of park features were nearing completion, as was the installation of traffic lights where the trail crosses Lawrence Avenue East.[16] An exception was the trail north of Bond Avenue. Scarsdale Road, running roughly parallel to the incomplete portion of the trail, was designated as Toronto Bike Trail 45, for cyclists.[8][17]

On August 2, 2017, the northern part of trail between Bond Avenue and York Mills Road was opened,[18] though that portion of the trail was not fully completed until about October 2016.[19]

As of 2017, the southern end of the trail ends at a dead-end about 60 metres (200 ft) north of the CPR line. Providing an exit at the southern end to Leslie Street depends on an commercial/industrial landowner agreeing to provide access over private land. As of October 2016, there was no deal to grant such access, after a landowner backed out of a tentative agreement.[20][19]

Other Toronto railpaths

gollark: Here is a similar thing for JSON. Note that it delegates out to an external JSON library for string escaping.```luafunction safe_json_serialize(x, prev) local t = type(x) if t == "number" then if x ~= x or x <= -math.huge or x >= math.huge then return tostring(x) end return string.format("%.14g", x) elseif t == "string" then return json.encode(x) elseif t == "table" then prev = prev or {} local as_array = true local max = 0 for k in pairs(x) do if type(k) ~= "number" then as_array = false break end if k > max then max = k end end if as_array then for i = 1, max do if x[i] == nil then as_array = false break end end end if as_array then local res = {} for i, v in ipairs(x) do table.insert(res, safe_json_serialize(v)) end return "["..table.concat(res, ",").."]" else local res = {} for k, v in pairs(x) do table.insert(res, json.encode(tostring(k)) .. ":" .. safe_json_serialize(v)) end return "{"..table.concat(res, ",").."}" end elseif t == "boolean" then return tostring(x) elseif x == nil then return "null" else return json.encode(tostring(x)) endend```
gollark: My tape shuffler thing from a while ago got changed round a bit. Apparently there's some demand for it, so I've improved the metadata format and written some documentation for it, and made the encoder work better by using file metadata instead of filenames and running tasks in parallel so it's much faster. The slightly updated code and docs are here: https://pastebin.com/SPyr8jrh. There are also people working on alternative playback/encoding software for the format for some reason.
gollark: Are you less utilitarian with your names than <@125217743170568192> but don't really want to name your cool shiny robot with the sort of names used by *foolish organic lifeforms*? Care somewhat about storage space and have HTTP enabled to download name lists? Try OC Robot Name Thing! It uses the OpenComputers robot name list for your... CC computer? https://pastebin.com/PgqwZkn5
gollark: I wanted something to play varying music in my base, so I made this.https://pastebin.com/SPyr8jrh is the CC bit, which automatically loads random tapes from a connected chest into the connected tape drive and plays a random track. The "random track" bit works by using an 8KiB block of metadata at the start of the tape.Because I did not want to muck around with handling files bigger than CC could handle within CC, "tape images" are generated with this: https://pastebin.com/kX8k7xYZ. It requires `ffmpeg` to be available and `LionRay.jar` in the working directory, and takes one command line argument, the directory to load to tape. It expects a directory of tracks in any ffmpeg-compatible audio format with the filename `[artist] - [track].[filetype extension]` (this is editable if you particularly care), and outputs one file in the working directory, `tape.bin`. Please make sure this actually fits on your tape.I also wrote this really simple program to write a file from the internet™️ to tape: https://pastebin.com/LW9RFpmY. You can use this to write a tape image to tape.EDIT with today's updates: the internet→tape writer now actually checks if the tape is big enough, and the shuffling algorithm now actually takes into account tapes with different numbers of tracks properly, as well as reducing the frequency of a track after it's already been played recently.
gollark: https://pastebin.com/pDNfjk30Tired of communicating fast? Want to talk over a pair of redstone lines at 10 baud? Then this is definitely not perfect, but does work for that!Use `set rx_side [whatever]` and `set tx_side [whatever]` on each computer to set which side of the computer they should receive/transmit on.

References

  1. "Way: 435267559".
  2. "Don Mills, Toronto, ON, Canada". Google Maps. Retrieved August 18, 2017.
  3. "Leaside, Toronto, ON, Canada". Google Maps. Retrieved August 18, 2017.
  4. "Lower Don Trail". City of Toronto government. Archived from the original on August 19, 2017. Retrieved August 18, 2017.
  5. "Don Mills Trail at Northern end of the trail". Google Maps. Retrieved August 7, 2017.
  6. "Ghosts of Raillines Past - Leaside Spur". The Railfanning Runner. July 24, 2012.
  7. "Leaside Spur I: Orphan Trail Needs Linkages". Don Watcher. September 15, 2011.
  8. "Leaside CN Rail Spur - Public Information Session No. 2" (PDF). City of Toronto government. August 31, 2010. Archived from the original (PDF) on August 8, 2017. Retrieved August 7, 2017.
  9. "Don Mills Trail at Lawrence Ave E". Google Street View. Retrieved August 7, 2017.
  10. "Bond Park Bridge nomination form" (PDF). City of Toronto government. 2012. Retrieved August 7, 2017.
  11. Ron Brown (2013). Rails across Ontario : exploring Ontario's railway heritage. Dundurn. pp. 135–136. ISBN 9781459707535. Retrieved August 23, 2017.
  12. Parker, Beth (March 1, 2013). "Longo's site is older than Town of Leaside". Leaside Life News. Retrieved August 9, 2017. By 1919 ... the CNoR was absorbed into the new Canadian National Railway. When the Leaside yards and repair shops were completed in 1920 they were almost redundant (especially after the Spadina yards were opened seven years later). They were closed in the 1930s...
  13. R.L.Kennedy for Old Time Trains. "Canadian Pacific Railway - Toronto Division - Agincourt, Scarborough, Leaside, Don". TrainWeb. Retrieved August 8, 2017.
  14. Mosleh, Omar (November 14, 2011). "Is Bond Park bridge falling down?". The Town Crier. Archived from the original on December 2, 2013.
  15. "Don Mills Trail at Lawrence Ave E - Oct 2011". Google Street View. October 2011.
  16. "Bicycle route 45 at Scarsdale Rd". Google Maps. July 2016. Retrieved August 24, 2017.
  17. "City of Toronto - Recently Completed" (PDF). York Region. 2016. Retrieved August 18, 2017. Don Mills Trail Extension from Bond Avenue to north of York Mills was opened on August 2, 2016. Two development applications to connect trail to Sunnybrook Park within 3-5 years.
  18. "Councillor Robinson's Fall 2016 Update". Jaye Robinson, Ward 25 Councillor. October 13, 2016. Don Mills Trail --- Asphalt was laid on the northern extension of the Don Mills Trail in early July. Crews were unable to complete some of the "hard" elements of the trail - including signage, riverstone, and a concrete pad - as doing so in the summer heat would have damaged the new asphalt. This work is now scheduled to be completed next month with "soft" elements, such as plantings, to be completed soon after. --- Securing a connection on the southern extension has proven to be difficult. I've been working non-stop on finding a solution to this problem since the beginning of my first term as Councillor and, as you may know, had come to a deal with one of the industrial landowners that would have established access to Leslie. Unfortunately, at the 11th hour, that deal fell through.
  19. Kuitenbrouwer, Peter (May 9, 2011). "Connected Don River bike path still a challenge". National Post. Retrieved August 8, 2017.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.