Dagenham East tube station
Dagenham East is a London Underground station located on the eastern side of the town of Dagenham in the London Borough of Barking and Dagenham, east London. It is on the District line between Dagenham Heathway to the west and Elm Park to the east. It is 6.4 kilometres (4.0 mi) along the line from the eastern terminus at Upminster and 27.8 kilometres (17.3 mi) to Earl's Court in central London where the line divides into numerous branches. The station has moderate usage for a suburban station, with approximately 3 million exits/entrances per year.
Dagenham East | |
---|---|
Station entrance | |
Dagenham East Location of Dagenham East in Greater London | |
Location | Dagenham |
Local authority | London Borough of Barking and Dagenham |
Managed by | London Underground |
Number of platforms | 3 |
Fare zone | 5 |
London Underground annual entry and exit | |
2014 | |
2015 | |
2016 | |
2017 | |
2018 | |
Railway companies | |
Original company | London, Tilbury and Southend Railway |
Pre-grouping | Midland Railway |
Post-grouping | London, Midland and Scottish Railway |
Key dates | |
1 May 1885 | Opened as Dagenham |
2 June 1902 | District line started |
30 September 1905 | District line withdrawn |
1932 | Station expanded |
12 September 1932 | District line restarted |
1 May 1949 | Station renamed Dagenham East |
1962 | Southend service withdrawn |
Other information | |
External links | |
WGS84 | 51.5444°N 0.1656°E |
It was opened as a main line station in 1885 and was called Dagenham. The current station buildings date from the introduction of electric services in 1932 and of typical railway architectural style for the period, with little trace remaining of the station's Victorian origins. In 2006 the station was extensively refurbished by Metronet.
History
The station was initially opened as a main line station on the London, Tilbury and Southend Railway in 1885, on a new branch connecting London with Southend by a more direct route than the existing service via Rainham. Dagenham was already served by a station on the original route at Dagenham Dock, 1.5 miles (2.4 km) to the south. The new station was opened as Dagenham, with the main station buildings on the up platform, which is now disused. From 1902 to 1905 the station was served by trains of the District Railway, who connected to the main line at a junction at Bow. The station was in a rural location until the building of the Becontree estate, of which it was on the eastern perimeter.
London, Tilbury and Southend Railway operation passed to the London, Midland and Scottish Railway and in 1932 an additional set of tracks were constructed between Barking and Upminster. The current station structures originate from this period. The new tracks were electrified and permitted the District line to operate as far Upminster for the first time since 1905. An additional station was opened at Heathway in 1932 and Dagenham East was renamed to its current name in 1949.[3] The station was predominantly served by the electric London Underground services and the main line platforms were eventually decommissioned in 1962, when those lines were overhead electrified. After nationalisation of the railways in 1948 management of the station passed to British Railways and in 1969 ownership transferred to the London Underground.[4]
Design
The station was refurbished by Metronet in 2006 as part of a series of improvements to the London Underground. These works included the installation of CCTV, provision of customer help points connected to a control room, a new public address system, electronic customer information displays on platforms and in the ticket hall, and the erection of new enclosed waiting areas. Ticket barriers are in operation. The station has three working platforms that are used by the District line, one for each direction of travel and another for terminating trains from central London during peak times.
Location
The station serves Eastbrookend Country Park to the east. North of the station is an industrial estate and the Victoria Road stadium. To the south is predominantly residential, including the historic Dagenham village. London Buses routes 103 and 364 serve the station.
Services
The station is in London fare zone 5. The typical off-peak service from the station is twelve District line trains per hour to Upminster and twelve to Earl's Court, of which six continue to Ealing Broadway and six continue to Richmond. At peak periods some trains continue from Earl's Court to Wimbledon. Services towards central London operate from approximately 05:00 to 23:45 and services to Upminster operate from approximately 06:00 to 01:30.[5] The journey time to Upminster is ten minutes; to Barking is ten minutes, and to Tower Hill is approximately 34 minutes.[5] During 2011 there were 2.22 million passenger entries and exits at the station, higher than the annual usage over the preceding two years, and typical for a suburban station.
Preceding station | Following station | |||
---|---|---|---|---|
District line | towards Upminster |
|||
Historical railways | ||||
Becontree | British Rail Eastern Region London, Tilbury and Southend Railway |
Hornchurch |
Railway station proposal
Barking and Dagenham London Borough Council propose the platforms on the National Rail route should be re-opened to provide interchange with c2c services, in connection with the London Riverside redevelopment to the south of the station.[6][7]
See also
References
Wikimedia Commons has media related to Dagenham East tube station. |
- "Multi-year station entry-and-exit figures (2007-2017)" (XLSX). London Underground station passenger usage data. Transport for London. January 2018. Retrieved 22 July 2018.
- "Station Usage Data" (CSV). Usage Statistics for London Stations, 2018. Transport for London. 21 August 2019. Retrieved 27 April 2020.
- Rose, D., The London Underground: A diagrammatic history, (1999)
- "Some basic UK rail statistics". Fifth Dimension Associates. 2009. Archived from the original on 30 July 2012. Retrieved 15 January 2010.
- "District line" (PDF). First and Last Trains. Transport for London. 10 December 2012. Archived from the original (PDF) on 1 June 2013. Retrieved 21 February 2013.
- "PROPOSED c2c TIMETABLE FOR DECEMBER 2015: CONSULTATION REPORT" (PDF). Archived from the original (PDF) on 19 March 2015. Retrieved 1 March 2015.
- "Transport Projects to Deliver Growth - Update and Review". Archived from the original on 2 April 2015. Retrieved 1 March 2015.