Bramley-Moore Dock Stadium

The Bramley-Moore Dock Stadium is a proposed football stadium by Everton on the Bramley-Moore Dock in Vauxhall, Liverpool, England. The dock itself was built in 1848. The stadium is proposed to be opened in time for the start of the 2023/24 season.

Proposed Bramley-Moore Dock Stadium
Full nameUSM Arena
LocationBramley-Moore Dock, Liverpool
Coordinates53.4250789°N 3.0027851°W / 53.4250789; -3.0027851
OwnerEverton
OperatorEverton
Capacity52,888
Construction
Construction costEstimated around £500 million
ArchitectMEIS Architects
BuilderLaing O’Rourke
Tenants
Everton (2023 or 2024)
Website
www.peoples-project.co.uk

Bramley-Moore Dock is within the Liverpool Maritime Mercantile City World Heritage Site. The dock is also in the planned Liverpool Waters.[1] The dock has Grade II listed buildings such as the hydraulic tower, dock retaining walls & gate towers.[2][3] Bramley Moore is an active commercial dock with one original transit shed from 1848 still in use.

Planning

Everton's search for a new home has been well-documented, including in recent years to the King's Dock and to Kirkby, the current path was first aired by Mayor Joe Anderson on 16 May 2016 following failed dialogue between the club and the Council over another potential site at nearby Walton Hall Park, suggesting Everton could have a new ground "within three years".[4] Two locations suggested were for a riverside site at Clarence Dock and a site at 'Stonebridge Cross' on the East Lancashire Road 3 miles north east of Goodison Park. [5]

On 4 January 2017, the club made it known that their favoured site was Bramley-Moore Dock (ahead of Stonebridge Cross), whilst Mayor Anderson said the council would invest £20m in a new road[6] near the planned ground, alongside plans for a railway station.[7] Everton brought in New York-based MEIS Architects to be involved with the project.[8][9]

In November 2017 the club agreed a 200-year lease with Peel Holdings for the dock site. [10] In January 2018 Everton shared their stadium "Key Principles".[11] Despite a close-season of change at the club which included the man chiefly involved in the stadium project, Robert Elstone, moving on to pastures new leaving his role as CEO,[12] little was heard from the club for over a year.[13]

In October 2018 the Club announced plans for a two-stage public consultation into the proposed move. [14] The first stage would launch in November 2018 with the second to follow in Summer 2019. It also confirmed its intention to submit a planning application for the project in late 2019. [15]

In March 2019, the plans were backed by Conservative peer and former deputy Prime Minister Lord Heseltine, [16] who described the stadium relocation as a "golden opportunity" for the city of Liverpool. [17]

In early July 2019, a report revealed that the proposed stadium would be worth nearly £800 million to the local area of north Liverpool. [18]

On 25 July 2019, the club unveiled its final designs for the stadium, under the heading 'The People's Project'. [19]

Funding

On 23 March 2017 it was announced that a deal had been agreed between Liverpool City Council, Everton F.C. and Peel Holdings to acquire the dock for a new football stadium.[20]

On 31 March 2017, Liverpool City Council voted in favour of creating a Special Purpose Vehicle company. The company was proposed with securing the funds for the stadium. The lenders would acquire a 200-year head-lease of the land from Peel, the landowners, and leasing the stadium to the SPV, which would in turn sub-lease to Everton for 40 years.[21][22]

The current funding model now proposed before Liverpool City Council (revealed at Everton's AGM on 9 January 2018) [23] would be an arrangement that will see the council borrow £280m at ultra-low interest rates from the government, and then pass that loan on to the club at a profit to the city of around £7m a year over 25 years.[24][25]. Costs for the new stadium now escalating to an estimated £500m,[26] would mean the club would still require to find the remaining £220m. As of June 2018 the council funding still not in place doubts were raised by Mayor Anderson if this funding model would be agreed.[27]

In March 2019, while attending the MIPIM property convention in Cannes, Everton’s chief executive Denise Barrett-Baxendale said the Club was “the most confident it has ever been” on securing funding for its new stadium. [28] In January 2019, deputy chairman Keith Harris said funding would not be triggered until planning permission had been granted.[29]

In July 2019, it was reported that the Club had options to fund the development from both the private and public sectors, which could include selling naming rights to a sponsor. [30] In January 2020, it was announced that Everton have agreed a naming right deal worth £30 million with Alisher Usmanov who already sponsors Everton's training ground, Finch Farm, strengthening his tie with the club.[31]

Public consultation

On 24 October 2018 Everton announced details of the start of the public consultation for the new stadium at Bramley Moore Dock and the legacy of Goodison Park[32] under the name "The People's Project". Consultation would begin on 15 November and last for three weeks.

In addition a new website was launched to provide information and updates in the project.[33]

In February 2019, Everton announced that more than 20,000 people had taken part in its first stage public consultation, "confirming overwhelming community support". [34]

In October 2019, the Club announced that 43,000 people had responded to its second stage of consultation, believed to be one of the largest responses to a commercial public consultation in Liverpool’s history. [35] It also announced that it remained on track to submit a planning application by the end of 2019. [36]

In November 2019, the results of the second stage consultation were announced, with 96 per cent of respondents supporting the plans and 98 per cent in favour of the design of the 52,000-capacity Bramley-Moore Dock stadium. [37]

The consultation has been praised by academic and marketers. Head of the Chartered Institute of Marketing, Chris Daly said, “Strong brands put their customer at the heart of everything they do, and Everton's stadium consultation is a shining example of this.” [38] The campaign was also nominated for the Northern Marketing Awards, winning ‘Best Property & Construction Campaign in November 2019. [39]

Following the success of the consultation the Club said it would submit its planning application “with confidence”. [40]

Proposed features

The proposed stadium is planned to be located behind this hydraulic tower at Bramley-Moore Dock. The tower will be kept as a feature.

The stadium will have a capacity of 52,888 seats, however the club have said that this could be increased to 62,000 seats in the future. The initial capacity will make it the seventh-largest Premier League stadium by capacity.

A key feature is the “home end”, a single-tier stand that will have a capacity of 13,000.

The Stadium architects described its brick and steel construction as appearing to have “risen from the dock" in tribute to the city's maritime past, with "a subtle nod" to the steel lattice trusses designed by Goodison Park's architect Archibald Leitch. [41]

The designs include a range of measures to preserve the heritage of the dock. As part of the proposed development a water channel would be maintained to the west of the stadium to ensure the visual continuity of the dock system, which is a key feature of the Outstanding Universal Value of the World Heritage Site. The proposals include restoring the dock’s historic Hydraulic Tower to create a unique visitor attraction. A number of other historic features would be preserved including, restoring and relaying the tracks of the old rail lines and restoring original features such as old gratings, paving and cobble stones, bollards, mooring posts, capstones and granite steps. [42]

gollark: Something something WSL?
gollark: Android has a "live caption" feature now, apparently, but it doesn't seem to be available elsewhere.
gollark: As locally runnable programs, not APIs.
gollark: Are there good autotranscription things available now?
gollark: I found Matrix homeservers to be horribly resource-intensive or broken. Did they fix that at all?

References

  1. Bond, Stephen (28 February 2011). "Assessment of the potential impact of the proposed Liverpool Waters master plan on OUV, at Liverpool Maritime Mercantile WHS, for English Heritage" (PDF). The Architects' Journal. p. 27. Retrieved 4 September 2016.
  2. McHale, Kirsty (30 August 2016). "New Everton stadium: The story of Bramley-Moore Dock". Liverpool Echo. Retrieved 30 August 2016.
  3. "Bramley Moore Dock Retaining Walls, Liverpool". British Listed Buildings. Retrieved 30 August 2016.
  4. Murphy, Liam (16 May 2016). "Liverpool Mayor says Everton will have new stadium 'within three years'".
  5. O’Keeffe, Greg (22 July 2016). "Everton new stadium comment: Blues challenge is to deliver the docks - but a Plan B is shrewd".
  6. Tyrrell, Nick (31 May 2018). "Plans in for £20m link road to provide access for Everton's proposed new stadium".
  7. "Everton reveal preferred stadium site". 22 August 2018 via www.bbc.co.uk.
  8. Braidwood, Ella (26 September 2016). "US sports specialist appointed to work on new Everton stadium". Architects Journal. Retrieved 23 March 2017.
  9. "Blog". MEIS architects.
  10. "Everton lease land at Bramley Moore Dock for proposed stadium".
  11. "New Stadium Key Principles - Everton Football Club". www.evertonfc.com.
  12. "Everton Announces Executive Leadership Restructure - Everton Football Club". www.evertonfc.com.
  13. "Oh, it's all gone quiet over here…". 8 June 2018.
  14. Champ2018-10-25T12:03:00+01:00, Hamish. "Everton FC to launch new stadium consultation". Building. Retrieved 29 November 2019.
  15. Hunter, Andy (24 October 2018). "Everton to launch public consultation over Bramley Moore stadium project". The Guardian. ISSN 0261-3077. Retrieved 29 November 2019.
  16. "Everton stadium move backed by Heseltine". 11 March 2019. Retrieved 29 November 2019.
  17. Houghton, Alistair (11 March 2019). "Ex-Tory minister says Everton's stadium is "golden opportunity" city can't miss". liverpoolecho. Retrieved 29 November 2019.
  18. https://peoples-project.co.uk/how-evertons-new-stadium-can-change-and-save-lives-in-north-liverpool/
  19. https://peoples-project.co.uk/
  20. "Everton agree deal for new stadium site". 23 March 2017 via www.bbc.co.uk.
  21. Hunter, Andy (23 March 2017). "Everton seek £300m to build stadium on Mersey site at Bramley Moore dock". The Guardian. Retrieved 23 March 2017.
  22. Hunter, Andy (31 March 2017). "Everton's plans for £300m new stadium approved by Liverpool City Council". The Guardian. Retrieved 2 April 2017.
  23. Houghton, Alistair (10 January 2018). "Liverpool council WILL loan Everton millions for new stadium, mayor says".
  24. "Financing Everton's New Stadium". toffeeweb.com.
  25. Prentice, David (2 February 2018). "The TRUTH behind the funding Everton FC's new stadium".
  26. Hunter, Andy (31 December 2017). "Everton's new stadium costs 'escalate significantly' with 2022 target now set". the Guardian.
  27. "Joe Anderson casts doubt on LCC funding for new stadium". toffeeweb.com.
  28. "Place North West | MIPIM | Everton: 'No option' but to progress as stadium costs hit £500m". Place North West. 12 March 2019. Retrieved 29 November 2019.
  29. Kirkbride, Phil (1 January 2019). "Everton firm up 'likely' Bramley-Moore stadium finance package". liverpoolecho. Retrieved 29 November 2019.
  30. "New Everton stadium to 'rise from dock'". 25 July 2019. Retrieved 29 November 2019.
  31. Bascombe, Chris (14 January 2020). "Everton agree £30m naming rights option for proposed new stadium with former Arsenal shareholder Alisher Usmanov". The Telegraph.
  32. http://www.evertonfc.com/news/2018/10/24/press-release
  33. https://www.peoples-project.co.uk/
  34. Bascombe, Chris (12 February 2019). "Everton receive community backing for dockside stadium move". The Telegraph. ISSN 0307-1235. Retrieved 29 November 2019.
  35. Jones, Adam (10 October 2019). "Everton announce record-breaking Bramley-Moore consultation numbers". liverpoolecho. Retrieved 29 November 2019.
  36. "Place North West | Everton Stadium on track for 2019 planning application". Place North West. 11 October 2019. Retrieved 29 November 2019.
  37. "'Huge public support' for Everton's new stadium". 13 November 2019. Retrieved 29 November 2019.
  38. "Everton stadium campaign praised by academics and marketers". Prolific North. 19 September 2019. Retrieved 29 November 2019.
  39. "The Northern Marketing Awards 2019: The Winners". Prolific North. 22 November 2019. Retrieved 29 November 2019.
  40. Markham, Carl (14 November 2019). "Everton FC can submit plans for new stadium 'with confidence'". northwales. Retrieved 29 November 2019.
  41. "New Everton stadium to 'rise from dock'". 25 July 2019. Retrieved 29 November 2019.
  42. "Consultation Roadshow – The People's Project". www.peoples-project.co.uk. Retrieved 29 November 2019.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.