Aubin Grove railway station
Aubin Grove station is a railway station on the Transperth network. Located on the Mandurah line, 24.3 kilometres from Perth station it serves the suburbs of Success, Atwell, Hammond Park and Aubin Grove.
Aubin Grove | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Aubin Grove bus station entrance in April 2017 | |||||||||||
Location | Kwinana Freeway, Success and Atwell Western Australia Australia | ||||||||||
Coordinates | 32°09′18″S 115°51′28″E | ||||||||||
Owned by | Public Transport Authority | ||||||||||
Operated by | Transperth | ||||||||||
Line(s) | Mandurah line | ||||||||||
Distance | 24.3 kilometres from Perth | ||||||||||
Platforms | 2 (1 island) | ||||||||||
Tracks | 2 | ||||||||||
Bus routes | 7 | ||||||||||
Bus stands | 4 | ||||||||||
Construction | |||||||||||
Structure type | Ground | ||||||||||
Parking | 2,000 bays | ||||||||||
Bicycle facilities | 88 bays | ||||||||||
Disabled access | Yes | ||||||||||
Other information | |||||||||||
Station code | RAG 99671 (platform 1) 99672 (platform 2) | ||||||||||
Fare zone | 3 | ||||||||||
History | |||||||||||
Opened | 23 April 2017 | ||||||||||
Electrified | Yes | ||||||||||
Services | |||||||||||
|
History
Aubin Grove station is located in the median strip of the Kwinana Freeway, just north of Russell Road between Cockburn Central and Kwinana stations. It is the largest park & ride station in Perth with 2,000 parking spaces.[1][2]
In July 2014, a tender was issued to build the station.[1][3][4] Construction started in late January 2016, with the station opening on 23 April 2017.[5][6]
Bus routes
There are seven bus routes which serve the station, connecting north to Cockburn Central Station, southeast to Wandi, southwest to Hammond Park and west to Wattleup.[6]
Stop | Route | Destination / description | Notes |
---|---|---|---|
[27565] Stand 1 | 534 | to Wattleup via Russell Road[8] | School days only |
535 | to Hammond Park via Macquarie Boulevard[9] | ||
536 | to Hammond Park via Barfield Road[10] | ||
[27566] Stand 2 | 537 | to Wandi via Lyon Road[11] | |
909 | Rail replacement service to Perth Station | ||
[27567] Stand 3 | 525 | to Cockburn Central Station via Baningan Avenue[12] | |
526 | to Cockburn Central Station via Wentworth Parade[13] | ||
[27568] Stand 4 | 527 | to Cockburn Central Station via Atwell & Aubin Grove[14] | |
909 | Rail replacement service to Mandurah Station |
References
- Tenders called for Aubin Grove Station project Urbanalyst 8 July 2014
- Fact Sheet Archived 22 January 2015 at the Wayback Machine Public Transport Authority
- Aubin Grove station designer selected Government of Western Australia 3 February 2015
- Government adds bridge widening to Aubin Grove station project WAtoday 24 April 2015
- Project Update # 4 Public Transport Authority March 2016
- Aubin Grove Station opens and changes to associated bus routes Transperth
- Mandurah Line Timetable Transperth 23 April 2017
- "Route 534". Bus Timetable 123 (PDF). Transperth. n.d. [effective from 21 July 2019].
- "Route 535". Bus Timetable 123 (PDF). Transperth. n.d. [effective from 21 July 2019].
- "Route 536". Bus Timetable 123 (PDF). Transperth. n.d. [effective from 21 July 2019].
- "Route 537". Bus Timetable 123 (PDF). Transperth. n.d. [effective from 21 July 2019].
- "Route 525". Bus Timetable 122 (PDF). Transperth. n.d. [effective from 21 July 2019].
- "Route 526". Bus Timetable 122 (PDF). Transperth. n.d. [effective from 21 July 2019].
- "Route 527". Bus Timetable 122 (PDF). Transperth. n.d. [effective from 21 July 2019].