Atlanta Terminal Subdivision
The Atlanta Terminal Subdivision is a railroad line owned by CSX Transportation in the U.S. State of Georgia. The Atlanta Terminal Subdivision is broken up into 5 sections known as "Charts" according to the CSX Transportation Timetable #3.[1]
Atlanta Terminal Subdivision | |
---|---|
Overview | |
System | CSX Transportation |
Status | operational |
Locale | Georgia, United States |
Operation | |
Owner | CSX |
Operator(s) | CSX |
Technical | |
Track gauge | 4 ft 8 1⁄2 in (1,435 mm) |
Chart A
This line runs from Marietta to Lithonia for a total of 44.2 miles (71.1 km). At its north end it continues south from the W&A Subdivision and at its south end it continues south as the Georgia Subdivision.
Chart B
This line runs from Tucker to Atlanta for a total of 13.3 miles (21.4 km). At its north end it continues south from the Abbeville Subdivision and at its south end it continues south as the W&A Subdivision.
Chart C
This line runs from Tilford Yard in Atlanta to Peachtree City for a total of 38.1 miles (61.3 km). At its north end it branches off from the Atlanta Terminal Subdivision Chart A and at its south end it continues south as the Manchester Subdivision.
Chart D
This line runs from Atlanta to Union City for a total of 18.7 miles (30.1 km). At its north end it branches off from the Atlanta Terminal Subdivision Chart A and at its south end it continues south as the A&WP Subdivision.
Chart E
This line is known as the Inman Park Belt Line and runs from Atlanta to Decatur for a total of 2.8 miles (4.5 km). At its north end it branches off from the Atlanta Terminal Subdivision Chart B and at its south end connects with the Atlanta Terminal Subdivision Chart A.[2]
See also
References
- CSX Transportation (January 1, 2005). "CSX Atlanta Division Timetable" (PDF). Multimodalways.
- "CSX Atlanta Terminal Sub". RadioReference.com.