Al Majd Road

Al Majd Road (formerly known as the Orbital Highway) is the longest highway in Qatar, running at a length of 195 kilometres (121 mi) from south-to-north.[1] It begins in Mesaieed in Al Wakrah Municipality and extends north towards Ras Laffan on the coast in Al Khor Municipality.

Al Majd Road
Orbital Highway
New Orbital Road and Truck Route
Exit 15 on Al Majd Road in Al Wakrah Municipality
Route information
Length195.0 km (121.2 mi)
Existed2017 (unofficially)
2019 (officially)–present
Major junctions
 G-Ring Road
Salwa Road
Dukhan Highway
Al Shamal Road
Location
Major citiesMesaieed, Doha Industrial Area, Al Khor, Ras Laffan
Highway system
Transport in Qatar

Constructed by Ashghal (the Public Works Authority), the road features 7 lanes in both directions which altogether can accommodate roughly 16,000 vehicles an hour. There are 21 main interchanges, linking the highway with other important roads such as G-Ring Road, Salwa Road, Dukhan Highway and Al Shamal Road.[2] Ashghal claims that the road reduces travel times by up to 50% from its beginning to end when compared to the alternative route running through Doha proper.[3]

The highway opened on an official level in February 2019; its opening marked a name change from the Orbital Highway to Al Majd Road.[4]

Description

Al Majd Road was designed to reduce traffic congestion in Doha by providing an alternative north-to-south route which strategically runs through most of Qatar's largest industrial and residential centers located outside Doha. The beginning and end points, Mesaieed and Ras Laffan, are both major industrial cities which generate heavy loads of traffic. Not far north of Mesaieed is Qatar's main commercial seaport Hamad Port, which directly connects with Qatar's most populated industrial area, the Doha Industrial Area exclave surrounded by Al Rayyan and Al Wakrah Municipality. Another industrial center which is indirectly served by the Al Majd Road is the western city of Dukhan, which connects at the Dukhan Highway–Al Majd Road junction.[3]

Development

Construction of Al Majd Road first began in early 2014 under the name Orbital Highway.[5] By July 2017 Ashghal announced that almost 125 km, or two-thirds of the highway had been constructed, marking the completion of phase one of development and its unofficial opening for traffic.[2]

The highway was officially completed and unveiled to the public in February 2019. Upon its unveiling, its name was changed from Orbital Highway to Al Majd Road, to reflect the popular cultural icon of Tamim Almajd, which was created during the Qatar diplomatic crisis.[4]

Major junctions

  • Al Majd Road–G-Ring Road junction is at Bu Jood Interchange. G-Ring Road is a highway running from Hamad International Airport to Al Majd Road. This junction provides an alternate route for residents of southern Doha and northern Al Wakrah who wish to travel to Lusail or Al Khor in the north or Dukhan in the west. Furthermore, new arrivals at the airport can bypass downtown Doha by arriving at this junction.[3]
  • Al Majd Road–Salwa Road junction is at Mesaieed Interchange, also known as Interchange 24. This junction allows residents of Al Rayyan City and the Doha Industrial Area to travel north towards Al Khor or south towards Mesaieed without crossing into Doha.[3]
  • Al Majd Road–Dukhan Highway junction is a crucial junction for traffic from Dukhan, Al Shahaniya and Rawdat Rashed which is headed towards Al Khor, Lusail, Mesaieed and Hamad International Airport.[3]
  • Al Majd Road–Al Shamal Road junctions are at Al Mazruah Interchange and Umm Asmira Interchange. This junction allows commuters from Al Khor travelling on Al Shamal Road easy access to Dukhan Highway via Al Majd Road. It also permits residents of Umm Salal Municipality to access Dukhan Highway without having to navigate the traffic of Doha proper.[3]
gollark: The pricing is weird, though, you have to admit. Trios cost more than godls.
gollark: I've never actually used it due to the pricing, but that's hardly the fault of its existence.
gollark: Citation: paginationless trading hub getting button color changes, market being unable to offer biome-varying dragons, no fixes to viewbombing, sickness for some reason.
gollark: DC: the home of uselessness
gollark: But yes, you do need to do that.

References

  1. "Expressway Programme Project Booklet" (PDF). KBR. p. 33. Archived from the original (PDF) on 19 January 2019. Retrieved 17 January 2019.
  2. "First phase of new Orbital Highway and Truck Route open for traffic". The Peninsula. 16 July 2017. Retrieved 17 January 2019.
  3. "Orbital Road a Key Artery to link Northern, Central and Southern Qatar". Ashghal. 14 February 2018. Retrieved 17 January 2019.
  4. "Al-Majd Road: The longest road in Qatar officially opened". The Peninsula. 7 February 2019. Retrieved 18 March 2019.
  5. "Latest Progress Update for the New Orbital Highway and Truck Route". Ashghal. 10 June 2015. Retrieved 17 January 2019.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.