0

I need to configure a Networker job than needs to start at a fixed time and to finish if it has not completed at a certain (later) time. That is, it has a fixed window.

But I do not manage to find any option in Networker to set an end time for a Group.

Envite
  • 368
  • 2
  • 13

1 Answers1

1

You could try the hard runtime limit in the group's advanced configuration.

From the Networker Administration Guide:

Hard runtime limit

This attribute indicates the time, in minutes, that any save session still running is ended and the savegrp program stopped. The default value is 0, which indicates that no Hard runtime limit is in effect.

Marki
  • 2,795
  • 3
  • 27
  • 45