Allowances

There are three types of allowance that may be added to a timing point location for a train.

Engineering

This is extra time to allow for a speed restriction on the railway.

It may also be called 'Box Time', as the Working Timetable encloses engineering allowances in a box or square brackets.

Pathing

This is extra time to ensure the train path doesn't conflict with others at a junction, or where trains running at different speeds are operating over a route.

It may also be called 'Circle Time', as the Working Timetable encloses pathing allowances in a circle or brackets.

Performance

This is extra time to provide a margin or buffer for late running on a day-to-day basis.

It may also be called 'Diamond Time', as the Working Timetable encloses performance allowances in a diamond or angle-brackets.

Network Rail Open Data Feeds
Data Feeds About the Feeds • Account States • Durable Subscriptions • Example Code ( PHP / C# / Java / Ruby / Node.js) • STOMP Client Libraries • Advanced Uses • FAQ • Release Notes
RTPPM RTPPM Feed
Train Movements Train Movements Feed • Train Activation • Train Cancellation • Train Movement • Train Reinstatement • Change of Origin • Change of Identity • Change of Location • TSPEED Field • Planned Cancellations • Cancellation Codes
TD TD Feed • C-Class Messages • S-Class Messages • Train Describers • TD Berths
VSTP VSTP Feed
TSR TSR Feed • Route Codes
SCHEDULE SCHEDULE Feed • TIPLOC Records • Schedule and Location Records • Association Records • CIF Codes • How Scheduling Works • Allowances
Reference Data Reference Data Feed • TOC Codes • CIF Codes • Delay Attribution Codes • Identifying Locations (STANOX, TIPLOC, NLC and 3-Alpha Codes) • STANOX Geographical Areas • Train Planning data (BPLAN)
This article is issued from Openraildata. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.