Introduction

This guide will guide you through removing the chain for cleaning or replacing. Be sure to keep all components in a sanitary place when storing them.

  1. knxaBegnqXhMVOJP
    knxaBegnqXhMVOJP
    6FLXjZRrK3VCdh52
    • Before performing any repairs, perform a water test on the pump by raising and lowering the handle a full 40 strokes. A properly performing pump will yield greater than 10 liters.

    • Remove the hex head bolt from the top of the access door on the pump head.

    • On reassembly, this bolt should be hand-tight.

  2. kc2lU4ebqKFBw1qN
    kc2lU4ebqKFBw1qN
    RnQHnIhOOpsDGOxf
    xOfQglAwmagVWqOA
    • Pull the access door straight up off the pump head.

    • Store the access door in a sanitary place to prevent contamination.

  3. JoFFylEdtWmtoaVd
    JoFFylEdtWmtoaVd
    EWeXySTTDWTlrIdC
    • The access door has a tongue that fits into the base of the pump head.

    • The access door makes a convenient tray to hold nuts and bolts during the disassembly.

  4. ZLyVQlSriGIPKxlb
    ZLyVQlSriGIPKxlb
    cE4kCkHEeyGF2Z33
    dFnMSifarrKBA2Py
    • Place the spacer collar around the pump rod below the raised chain, with the beveled side down, and the flat side facing up.

  5. jmjPoMTClufyYHRg
    jmjPoMTClufyYHRg
    ilaDGuKR5gNU4oXh
    otydbJoQoRkXb2Eb
    • The following procedure requires two people. If you attempt to do this alone, you risk injuring yourself and damaging the pump.

    • Lift the pump handle until the base of the chain comes to rest on the spacer collar, and the chain is slack. Hold the handle in this position while the chain is being detached.

  6. nganIEDqQwYTW1bG
    nganIEDqQwYTW1bG
    fDEoPsAF4IGJN1hN
    UOEYfclHQGql4MKv
    • Using the two access holes, place an angled socket wrench on the bolt and nut attaching the chain to the pump handle.

  7. wMxHBO5NN4iLT6W2
    wMxHBO5NN4iLT6W2
    yt3EcteQG1QO5x6M
    yWTHPjfWm1A5blFC
    • Hold the wrench on the bolt stationary.

    • Loosen the nut.

  8. BbMrLL1NYZ1Py1OV
    BbMrLL1NYZ1Py1OV
    rGRfQYBIxUvRieBY
    CL2VfUlxpEkiFZ4a
    • Remove the nut from the chain bolt.

  9. L2PxN3LCJESbIObN
    L2PxN3LCJESbIObN
    xsjVCgKRRRdTMRDR
    • Remove the washer from the chain bolt.

  10. NqcotAWFnyxiFXwx
    NqcotAWFnyxiFXwx
    h24eMFUR4mQ5JwnC
    • Remove the chain bolt.

  11. tXEBpJUxjYvmSfIq
    tXEBpJUxjYvmSfIq
    eYRLASOYRcjpDlvp
    udcSSChydYn2GRbd
    • Pull the top of the chain straight off of the pump handle.

  12. GJxwqLAEANxLtUXX
    GJxwqLAEANxLtUXX
    UTEf23lXEmFQyDUK
    Ex3gCFs3NbCTTE3g
    • Remove the two bolts from the handle side of the pump head.

    • Use one wrench on the bolt and another on the nut beneath. Hold the bolt stationary and loosen the nut.

  13. HhUh4mhCk1JWbNnY
    HhUh4mhCk1JWbNnY
    M4aJhE4fVSbuF5TM
    oITGrcZ5ybGfC4OD
    • Remove the two bolts and nuts from the handle side.

  14. DNvokHC6LZoMB5rR
    DNvokHC6LZoMB5rR
    LDlWCWKQQWSDCl1G
    • After removing the two handle side bolts, have your partner support the weight of the handle.

    • Remove the two remaining bolts in the same fashion.

  15. UY3elijHKIGTfwdq
    UY3elijHKIGTfwdq
    bG4MLdoJ5APVVpX6
    fbJKXe55tW5KpGXl
    • Lift and remove the pump head from the pump.

    • Store the pump head in a sanitary place, preferably above ground, to prevent contamination.

  16. 4bXYCZRoyJ1fdPAG
    4bXYCZRoyJ1fdPAG
    FIZJFX1hlIP1S4Ht
    • Slightly twist the head flange, until the corners overhang the top of the tank far enough to grab.

  17. l5ncAlNyKew6FItl
    l5ncAlNyKew6FItl
    NHhWrr2ji4o4YceH
    oBfBvSJsFlltNTho
    • Lift the head flange up about one foot above the tank.

  18. JJRjLRwXUmtHKHdD
    JJRjLRwXUmtHKHdD
    GAERVBviXLAIqf5f
    vbLVIqhYO2YjLHSN
    • Slide the rod clamp around the pump rod, and support it on the tank base.

    • Make sure the pegs in the base of the rod clamp fit into the appropriate holes in the top of the tank.

  19. H1rBYRCAtUKwDFJ6
    H1rBYRCAtUKwDFJ6
    6Efc46MMDgGNPLEA
    • Tighten the rod clamp against the pump rod.

    • Be sure the pump rod is centered within the jaws of the clamp and held securely.

  20. QQXeFxl531QbsLhU
    QQXeFxl531QbsLhU
    gQEluTLutxObYIlX
    • Lower the head flange.

  21. QjMFNmaPcbuLNd3J
    QjMFNmaPcbuLNd3J
    NeKlsiQA35DXGBfj
    GqR1vwoRtvExsrrd
    • Unscrew the chain from the top of the pump rod.

    • Remove the chain.

    • Check the chain for signs of wear or damage.

    • Set the chain in a sanitary place, such as the access door that was previously removed.

Conclusion

To reassemble your device, follow these instructions in reverse order.

Andrew Optimus Goldheart

Member since: 17/10/09

502341 Reputation

0 comments