Wanda–Zhonghe–Shulin line

The Wanda–Zhonghe–Shulin or Light Green (code LG) line (Chinese: 萬大中和樹林線) is a metro line under construction in Taipei. It is managed by the Taipei City Government Department of Rapid Transit Systems and scheduled to be complete in 2025.[1] Following the Taipei Metro's color coding scheme, the Wanda-Zhonghe-Shulin line will be light green, with stations abbreviated as "LGXX" ("XX" being the station number). When Phase I is completed, the line is expected to carry 270,000 riders per day, and passengers will be able to travel between the terminus at Zhonghe Senior High School and Taipei Main Station in 25 minutes.[2]

Wanda–Zhonghe–Shulin line
LG
Overview
TypeRapid transit
LocaleTaipei and New Taipei, Taiwan
TerminiChiang Kai-shek Memorial Hall
Juguang
Stations22
Operation
Planned opening2025
Operator(s)Taipei Rapid Transit Corporation
CharacterUnderground, Elevated
Depot(s)Jincheng Depot
Technical
Line length22.1 km (13.7 mi)
Track gauge1,435 mm (4 ft 8 12 in) standard gauge
Route map
 Tamsui-Xinyi line to Tamsui
 Songshan-Xindian line to Songshan
Chiang Kai-shek Memorial Hall
 Tamsui-Xinyi line to Xiangshan
 Songshan-Xindian line to Xindian
Taipei Botanical Garden
Xiaan
Jiala
Yonghe
 Circular line clockwise
Zhonghe
 Circular line anticlockwise
Shuanghe Hospital
Zhonghe Senior High School
Jugang
Jugang Branch Line
TBA
Zhongzheng Junior High School
 Bannan Line to Dingpu
Tucheng
 Bannan Line to Taipei Nangang Exhibition Center
Pitang
TBA
TBA
TBA
TBA
Shulin
TBA
TBA
TBA
Huilong
 Zhonghe-Xinlu Line to Nanshijiao
Note: those in italics are only possible names and might change.

Phase I

This medium-capacity route was approved by the Executive Yuan on 12 February 2010.[3] It is split into two phases. Phase I consists of nine underground stations and a depot in Jincheng Road. The 9.5 km long line (Phase I) will connect to the Songshan–Xindian line at Chiang Kai-shek Memorial Hall (LG01), one of its termini. Also, this line goes under the Xindian River between LG04 and LG05.[4] Jincheng Road (LG08) is where the other terminus is located, and may be named as Zhonghe Senior High School Station.[5] A branch line consists of only Zhonghe Senior High School and Juguang stations.

Stations

Stations LG01–08A are currently under construction, scheduled for completion in 2025.

Code English name Chinese name Districts Notes
LG01 Chiang Kai-shek Memorial Hall 中正紀念堂 Zhongzheng Planned connection to Tamsui–Xinyi line and Songshan–Xindian line
LG02 Taipei Botanical Garden 植物園 Zhongzheng
LG03 Xiaan 廈安 Wanhua
LG04 Jiala 加蚋 Wanhua
LG05 Yonghe 永和 Yonghe
LG06 Zhonghe 中和 Zhonghe Planned connection to Circular line
LG07 Shuang Ho Hospital 雙和醫院 Zhonghe
LG08 Zhonghe Senior High School 中和高中 Zhonghe
LG08A Juguang 莒光 Zhonghe

Phase II

Phase II is approved for construction. Its termini are located at Huilong (LG21) and somewhere near Jincheng Lide Intersection, which is possibly Qingshui Station (LG09).[6] From stations LG01 to LG10, the track is underground, but LG11 to LG21 run aboveground.[7]

This phase is still under planning. The Taipei City Government is the local authority. The funds will be borne by the Central Government and the New Taipei City Government. The total project funding is about 55.881 billion NTD. The current plan has been submitted to Ministry of Transportation and Communications on January 26, 2017. The ministry deliberated, and the high-speed railway engineering bureau of the ministry is conducting a written review operation in conjunction with relevant units. The second phase of the route is located within New Taipei City. At present, changes to urban planning and bidding for basic designs have begun. After the Taipei and New Taipei City conferences are held to reach a consensus, the plan will be submitted to the central government for further review. On May 2, 2018, the Ministry of Transportation and Communications merged the project into the second phase of the project of Forward-Looking Infrastructure. [8]

Dates

  • October 2014: Groundbreaking ceremony held in New Taipei City
  • 8 November 2014: Groundbreaking ceremony held in Taipei City[1]

References

  1. Gerber, Abraham (9 November 2014). "MRT line to take 8 years: DORTS". Taipei Times. Retrieved 9 November 2014.
  2. "Ten Major Projects of Taipei -- A New Vision of Hope and Wealth Creation". Taipei City Government. 2013-04-10. Retrieved 2013-09-19.
  3. http://www.dorts.gov.tw/ct.asp?xItem=17879339&CtNode=32181&mp=115001 Department of Rapid Transit Systems, TCG. 2012-05-11. Retrieved 2013-08-25.
  4. http://www.dorts.gov.tw/ct.asp?xItem=56178558&CtNode=32185&mp=115001 Department of Rapid Transit Systems, TCG. 2013-08-05. Retrieved 2013-08-25.
  5. http://english.dorts.taipei.gov.tw/ct.asp?xItem=205658&ctNode=19582&mp=115002 Department of Rapid Transit Systems, TCG. 2013-07-03. Retrieved 2013-08-05.
  6. http://www.dorts.gov.tw/ct.asp?xItem=17879339&CtNode=32181&mp=115001 Department of Rapid Transit Systems, TCG. 2013-05-27. Retrieved 2013-08-18.
  7. http://www.dorts.gov.tw/ct.asp?xItem=20698926&CtNode=44252&mp=115001 Department of Rapid Transit Systems, TCG. 2013-05-27. Retrieved 2013-08-25.
  8. https://zh.m.wikipedia.org/wiki/%E8%90%AC%E5%A4%A7-%E4%B8%AD%E5%92%8C-%E6%A8%B9%E6%9E%97%E7%B7%9A 萬大-中和-樹林線, TCG. 2020-02-24. Retrieved 2020-03-12.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.