Melo HVDC Back-to-back station

The Melo HVDC Back-to-back station is the central part of the EHV-interconnection between Uruguay and Brazil, which is only possible by means of a frequency converter, as the frequency of the power grid in Uruguay is 50 Hz and that in Brazil is 60 Hz. The station, which is situated east of Melo, Uruguay, is interconnected by the San Carlos substation with a 283 kilometres long 500 kV line. It is capable of transferring 500 MW, and was built by AREVA in 31 months from 2009 to 2011.

From the Melo station a 128 kilometres long 525 kV powerline, of which 65 km are situated in Uruguay, runs to a newly built 525 kV/230 kV substation close to the Candiota power station, which contains some harmonic filters.[1]

See also

References

  1. Horwill, C.; Macleod, N. M.; Bonchang, R. E.; Castagna, D; Artenstein, M.; Croce, M. (2011). "A new 500MW frequency converter station to exchange power between Uruguay and Brazil". IEEE/PES Power Systems Conference and Exposition. PSCE 2011. pp. 1–6. doi:10.1109/PSCE.2011.5772566.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.