Chaku Khola Hydropower Station is a run-of-the-river hydroelectric power station with an installed capacity of 3 MW[1]. The power station is located in Sindhupalchok District, Nepal. The plant is operated by Alliance Power Nepal, an IPP.[2][3]

Chaku Khola Hydropower Station
CountryNepal
LocationSindhupalchok District
PurposePower
StatusOperational
Owner(s)Alliance Power Nepal
Dam and spillways
Type of damGravity
ImpoundsChaku River
Commission date2062-03-01 BS
TypeRun-of-the-river
Installed capacity3 MW

Accidents

  • 2015 October: The project was severly damaged due to aftershock of the Gorkha Earthquake.[4]
  • 2019 July: Two staffs were killed due to flood in the river.[5]