The Rajpura-Bathinda line is a railway line connecting Rajpura in the Indian state of the Punjab and Bathinda in Punjab. The line is under the administrative jurisdiction of Northern Railway.

Rajpura-Bathinda line
Overview
SystemDiesel operated (electrification and doubling) electrified till patiala from Rajpura end
StatusOperational
LocalePunjab
TerminiRajpura
Bathinda
Operation
OwnerIndian Railway
Operator(s)Northern Railway
Technical
Track length173 km (107 mi)
Number of tracks1 (single)
Track gauge1,676 mm (5 ft 6 in) broad gauge
Electrificationdoubling in progress with electrification
Highest elevation
  • Rajpura 274 m (899 ft)
  • Bathinda 207 m (679 ft)
Route map

[1][2][3][4][5]

Main stations

History and key developments on the route

It is said that Maharaja of patiala built the railway station in the perpendicular orientation as he had hoped that one day the Ambala-Ludhiana would be diverted via Patiala, but that never happened. One reason was the trains would have to pay the taxes levied by the Pepsu state.

In February 2015, doubling of track between Rajpura-Patiala-Bathinda was sanctioned.

In 2016, electrification of the single broad gauge railway line from Rajpura to Dhuri junction was under progress which is being executed by Rail Vikas Nigam Ltd.

Patiala Railway Station on the line is also one of the 400 stations to be redeveloped under Government of India's AMRUT scheme. In 2016, the work for the platform-1 extension is in progress which shall be extended to another 200 meter to accommodate longest possible train.

In March 2017, work for doubling of Rajpura-Patiala-Bathinda line was partly given to Northern railway construction but later all was allotted and interested to rail vikas nigam limited. As it is also a feeder route for Eastern Dedicated Freight Corridor. It has capacity utilisation to the peak. The doubling is scheduled to start for December 2018.

Electrification

The rail link has been approved by the rail board for electrification to the Lehra Mahabat railway station and doubling to Bathinda junction. The electrification trail between Rajpura and Dhuri was completed on 10 September 2019. CRS has given clearance to electrification up to Dhuri Junction.