Atlanta Terminal Subdivision

The Atlanta Terminal Subdivision is a railroad line owned by CSX Transportation in the U.S. State of Georgia. The Atlanta Terminal Subdivision is broken up into 5 sections known as "Charts" according to the CSX Transportation Timetable #3.[1]

Atlanta Terminal Subdivision
Overview
SystemCSX Transportation
Statusoperational
LocaleGeorgia, United States
Operation
OwnerCSX
Operator(s)CSX
Technical
Track gauge4 ft 8 12 in (1,435 mm)

Chart A

This line runs from Marietta to Lithonia for a total of 44.2 miles (71.1 km). At its north end it continues south from the W&A Subdivision and at its south end it continues south as the Georgia Subdivision.

Chart B

This line runs from Tucker to Atlanta for a total of 13.3 miles (21.4 km). At its north end it continues south from the Abbeville Subdivision and at its south end it continues south as the W&A Subdivision.

Chart C

This line runs from Tilford Yard in Atlanta to Peachtree City for a total of 38.1 miles (61.3 km). At its north end it branches off from the Atlanta Terminal Subdivision Chart A and at its south end it continues south as the Manchester Subdivision.

Chart D

This line runs from Atlanta to Union City for a total of 18.7 miles (30.1 km). At its north end it branches off from the Atlanta Terminal Subdivision Chart A and at its south end it continues south as the A&WP Subdivision.

Chart E

This line is known as the Inman Park Belt Line and runs from Atlanta to Decatur for a total of 2.8 miles (4.5 km). At its north end it branches off from the Atlanta Terminal Subdivision Chart B and at its south end connects with the Atlanta Terminal Subdivision Chart A.[2]

See also

References

  1. CSX Transportation (January 1, 2005). "CSX Atlanta Division Timetable" (PDF). Multimodalways.
  2. "CSX Atlanta Terminal Sub". RadioReference.com.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.