Wanquanheqiao station

Wanquanheqiao station (Chinese: 万泉河桥站) is a station under construction on Line 16 of the Beijing Subway.

Wanquanheqiao

万泉河桥
Construction site
LocationIntersection of 4th Ring Road and Wanquanhe Rd., Haidian District, Beijing
China
Coordinates39°59′02″N 116°17′35″E
Operated byBeijing MTR Metro Line 16 Corp., Ltd.
Line(s)     Line 16
Platforms2 (1 island platform)
Tracks2
Construction
Structure typeUnderground
Disabled accessYes
History
Opened2020 (planned)[1]

History

Planning

In 2011, the original plan for line 16 was to go past Changchunyuan Park then turn south, going along Summer Palace Road after passing Haidian stadium, then going past Suzhoujie station. The station was originally called Haidianqiao station.[2] However, the planned line went near Peking University, which had vibration issues with its precision instruments when Line 4 was built east of the campus. In 2011, the precision instruments was already affected by a smaller area reconstruction's vibration,[3] and because Line 16 would only be 200 meters away from Peking University, the precision instruments would be severely affected by the line, and scientific work would be severely disrupted. Because of this, the Beijing Municipal Planning Commission has to study the vibrational impact of the campus precision instruments,[4] and NPC deputies submitted a proposal in 2012.

On August 5, 2013, the Beijing Municipal Planning Commission announced a proposal for rerouting Line 16 between Xiyuan and Suzhoujie stations. The line was to turn south, going under Haidian Township, then turning east at Haidian Park, going under Wanquanhe bridge, then turning south at Suzhou Rd. The station will be under Wanquanhe bridge.[5] Previous studies has shown that the line cannot meet Peking University's vibration and noise reduction measures.[6] In December 2013, the final plan was released, which included Wanquanheqiao station.[7]

Construction

Construction of this station started on September 6, 2014. The station was connected to Xiyuan station in March 2017.[8] The station will open in 2020 [1]

Station Layout

G Entrances and Exits
B1 Concourse Faregates, Station Agent
B2 Northbound      Line 16 towards Beianhe (Xiyuan)
Island platform, doors open on the left
Southbound      Line 16 towards Wanpingcheng (Suzhoujie)
gollark: I fear it.
gollark: The very ominously named "online safety bill" is very ominous and would impose ridiculous compliance requirements on basically everything, as well as allowing the media regulator to block sites which don't comply, as well as in a plausibly-deniable way banning end to end encryption, as well as requiring all web platform things to censor "harmful content".
gollark: The UK is also doing bad things nominally but not really in opposition to technology companies.
gollark: Australis is doing rather bad things seemingly not driven by and not desired by any tech companies.
gollark: Much of that seems to be from governments now.

References


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.