Tamil Nadu Generation and Distribution Corporation
The Tamil Nadu Generation and Distribution Corporation Limited (Tamil: தமிழ்நாடு மின் உற்பத்தி மற்றும் பகிர்மானக் கழகம் (வரையறுக்கப்பட்டது)) is an electrical power generation and distribution public sector undertaking that is owned by the Government of Tamil Nadu. It was formed on 1 November 2010 under section 131 of the Electricity Act of 2003, and is the successor to the erstwhile Tamil Nadu Electricity Board. The electricity board's generation and distribution wings are its nucleus.[3] TANGEDCO is a subsidiary of TNEB Limited.
Native name | தமிழ்நாடு மின் உற்பத்தி மற்றும் பகிர்மானக் கழகம் |
---|---|
Public Sector Undertaking | |
Industry | Electric utility |
Predecessor | Tamil Nadu Electricity Board |
Founded | 1 November 2010 |
Headquarters | , |
Area served | Tamil Nadu |
Key people | Pankaj kumar Bansal (Chairman & MD) |
Products | Electric power |
Services | Electricity generation Electricity distribution |
Revenue | |
Total assets | |
Owner | Government of Tamil Nadu |
Parent | TNEB Limited |
Divisions | Electricity Generation Wing Electricity Distribution Wing |
Website | www |
Operation
Generation
To satisfy the energy needs of the state, Tamil Nadu Electricity Board has a total installed capacity of 10,214 MW which includes shares from the State government, Central government and Independent power producers. The state also has installations with renewable energy sources such as windfarms that supply up to 4,300 MW. Due to the astronomical increase in energy demand in recent years, the state has a power deficit which is estimated to be approx. 11.9% as of Feb 2009. To meet the ever-increasing energy demand, TNEB has proposed a number of next-generation projects to be constructed over the next 5 years.
The company operates four large thermal power stations:
- Ennore Thermal Power Station (ETPS) - 450 MW (2x60, 3x110 MW)
- Mettur Thermal Power Station (MTPS) - 1440 MW (4x210, 1x600 MW)
- North Chennai Thermal Power Station (NCTPS) 1830 MW (3x210 MW, 2x600 MW)
- Tuticorin Thermal Power Station (TTPS) - 1050 MW (5x210 MW)
The company operates two large Nuclear power stations:
- Kudankulam Nuclear Power Plant - 2000 MW (2x917,2x917(under construction))
- Madras Atomic Power Station - 470 MW (2x235,1X500( Under construction))
The Company Operates large Wind Power Stations:
- Siemens, GE, Enercon, Sulzon Group, Goldwind, Vestas – Tamil Nadu's wind power capacity is around 29% of India's total. The Government of Tamil Nadu realized the importance and need for renewable energy, and set up a separate Agency, as registered society, called the Tamil Nadu Energy Development Agency (TEDA) as early as 1985. Now, Tamil Nadu has become a leader in Wind Power in India. In Muppandal windfarm the total capacity is 3500 MW, the largest wind power plant in India. The total wind installed capacity is 7684 MW from 13,69,856 wind turbines (As per 2013 survey from TEDA). During the fiscal year 2016-17, the electricity generation is 9.521 GWh, with about a 15% capacity utilization factor.
Distribution
TNEB has a consumer base of about 20 million consumers. 100% rural electrification has been achieved. The per capita consumption of Tamil Nadu is 1000 units. To achieve the goal of electrification of all households, the Government has launched the Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) scheme, where, if grid connectivity is not feasible or not cost effective, then "Decentralized Distributed Generation" is permitted. Even when Tamil Nadu had an option to share the electricity with neighbouring States it never happened.
The Ministry of Power has launched the restructured Accelerated Power Development and Reforms Programme scheme under the 11th five-year plan. The plan is expected to achieve a reliable and quality power supply and to minimize the loss of energy.
New Projects[4]
- Uppur Thermal Power Project(2 x 800 MW)
- North Chennai Thermal Power Station Stage III Thermal Power Project (1x800MW)
- North Chennai Thermal Power Station Stage – IV (2 x 800 MW)
- Tuticorin Thermal Power Station (1 x 800 MW)
References
- "Balance Sheet 31.03.2018".
- "Balance Sheet 31.03.2018".
- "Formation of TANGEDCO". TANGEDCO. Retrieved 4 June 2012.
- http://www.tangedco.gov.in/linkpdf/newprj.pdf