Stockholm Ring Road

The Stockholm Ring Road (Swedish: Stockholms ringled) is a half-completed ring road around central Stockholm, Sweden. There have been many plans over the years of a ring road around central Stockholm, but all of them have been cancelled at some point. As of 2015, three quarters of the ring road have been built.

Stockholm ring road according to the 1992 plan

History

The first plan to build a motorway ring road around central Stockholm arose in the 1950s. The recent ring road project in Stockholm has its origin in the Dennis Agreement (Dennisöverenskommelsen) from 1992, which was a political agreement (negotiated by the Bank of Sweden governor Bengt Dennis) to build new roads and improve public transport in and around Stockholm. As the agreement was eventually broken in 1997 due to criticism from environmental groups and the political parties left outside the agreement, the future of a complete ring road became uncertain.[1]

A possibility of a ring road being completed arose in the mid-2000s, as the construction of the northern section resumed during 2006 with preparatory work, the final appeals against construction were rejected on February 26, 2007 by the Supreme Administrative Court.[2] Actual construction of the road resumed on May 11, 2007,[3] and the project was finally completed in 2015, save for a northbound exit which is planned in 2016. A new feasibility study was conducted on the eastern section in 2006.[4] A second shorter study, looking at a deeper tunnel with less impact on the surface during construction, was conducted in 2015, and is currently awaiting political blessing.

Road sections

There are four distinct sections of the planned ring road around Stockholm, of which two are completed, one in construction, and one under consideration.

  • Essingeleden, the western section completion of various stages between 1966 and 1971.
  • Södra länken, the southern section short section opened 1973, inauguration of the completed road 2004
  • Norra länken, the northern section short section opened in 1991, construction of the rest halted in 1997, construction resumed 20062007,[3][5] and the road tunnel was opened in 2014.[6]
  • Österleden, the eastern section planning cancelled in 1997. New feasibility study completed in 2006,[4] second study in 2015. Estimates for construction start in 2020 and completion in 2030.[7]
gollark: You know, 13 was a prime number.
gollark: APIONET has nothing like a nickname registration system.
gollark: I mean, Kit was me a while back.
gollark: Do we know that?
gollark: Anyway, I don't see why 18000 upvotes on apioforms is so implausible to you. Do you think that little of apiology?

References

  1. Malmsten, Bo; Persson, Magnus (2000). Dennispaketet – låsningar och lösningar. Regionplane- och trafikkontoret, Stockholms läns landsting. ISBN 91-86574-55-8. Archived from the original on 2007-09-28. Retrieved 2007-08-11.
  2. "Klartecken för Norra länken" (Press release). Swedish Road Administration. 2007-02-26. Retrieved 2007-08-11.
  3. "Aktuellt om Norra länken: Spadtag för Norra länken". Swedish Road Administration. 2007-05-11. Archived from the original on 2007-08-04. Retrieved 2007-08-11.
  4. "Östlig förbindelse". Swedish Road Administration. 2006-10-17. Archived from the original on 2007-10-14. Retrieved 2007-08-12.
  5. "Om projektet Norra länken". Swedish Road Administration. 2007-02-27. Retrieved 2007-08-11.
  6. Swedish Transport Administration. Trafikverket http://www.trafikverket.se/norralanken/. Missing or empty |title= (help)
  7. "Stökigt i Stockholm många år framöver". Dagens Nyheter. 2008-01-06. Retrieved 2008-01-07.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.