Shiloh–Scott station
Shiloh-Scott is a St. Louis MetroLink station located adjacent to Scott Air Force Base in Shiloh, IL, and is the eastern terminus of the MetroLink system. It opened on June 23, 2003, as part of Phase 2 of the St. Clair County Extension, which extended MetroLink 3.5 miles (5.6 km) from College to Shiloh-Scott station.[1] The station is divided into two sections: one side is open to the general public and the other side to those with Scott Air Force Base security clearances.[2] Each side has its own park and ride lot.
Shiloh-Scott | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
MetroLink light rail station | |||||||||||
Location | 880 Metro Plaza Lane Shiloh, Illinois 62221 | ||||||||||
Coordinates | 38.53888°N 89.87906°W | ||||||||||
Owned by | Bi-State Development Agency | ||||||||||
Operated by | Metro Transit | ||||||||||
Platforms | Island platform | ||||||||||
Tracks | 2 | ||||||||||
Connections | |||||||||||
Construction | |||||||||||
Structure type | At-grade | ||||||||||
Parking | 645 civilian park and ride spaces 421 military park and ride spaces 50 long-term spaces | ||||||||||
Disabled access | Yes | ||||||||||
History | |||||||||||
Opened | June 23, 2003 | ||||||||||
Traffic | |||||||||||
Passengers (2007) | 1,409 | ||||||||||
Services | |||||||||||
|
Future extension
Design work has been completed on the 5.3-mile (8.5 km) St. Clair Extension of MetroLink from Shiloh-Scott to MidAmerica Airport in Mascoutah, IL, though no funding has yet been secured.[3]
Station layout
P Platform level |
Westbound | ← Red Line toward Lambert Airport (College) |
Island platform, doors will open on the left | ||
Westbound | ← Red Line toward Lambert Airport (College) | |
Street level | Exit/entrance, parking, buses |
gollark: I mostly just disabled everything but the flux gates and potentiometers.
gollark: You can hard-disable the items at least!
gollark: Yes, but probably not good configs.
gollark: Now, my pack isn't entirely *balanced*. But I hold tightly to the principle of it being viable to use different things.
gollark: Yes.
References
- "Shiloh-Scott MetroLink Station Grand Opening Today" (PDF) (Press release). Metro. 2003-06-21. Archived from the original (PDF) on 2006-09-24. Retrieved 2008-08-08.
- "St. Clair County MetroLink Extension – Phase 2". Metro. Archived from the original on 2008-07-30. Retrieved 2008-08-12.
- "St. Clair County MetroLink Extension – Phase 3". Metro. Archived from the original on 2008-07-30. Retrieved 2008-08-12.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.