Sedgwick Avenue station

Sedgwick Avenue was an elevated, ground level and underground station on the Bronx extension of the IRT Ninth Avenue Line which ended service to the station in 1940.[2]

 Sedgwick Avenue
 
Former New York City Subway station
Sedgwick Avenue station, c.1918.
Station statistics
AddressSedgwick Avenue near 161st Street
Bronx, NY
BoroughThe Bronx
LocaleHighbridge
Coordinates40°49′52.8″N 73°55′56.6″W
DivisionA (IRT)
LineIRT Ninth Avenue Line
ServicesNone (abandoned)
Platforms2 side platforms
Tracks2
Other information
OpenedJuly 1, 1918 (July 1, 1918)
ClosedAugust 31, 1958 (August 31, 1958)[1]
Station succession
Next northAnderson–Jerome Avenues
Next south155th Street

History

This station was built to connect to the New York & Putnam Railroad passenger trains that terminated there instead of the former 155th Street terminal and New York Central Railroad Hudson Division trains that stopped at the new (1918) platforms at this location. This station opened on July 1, 1918, and remained in use by the Polo Grounds Shuttle until 1958. The Putnam Division of the New York Central also ended service in 1958.[3]

Station layout

This station was built extending from the tunnel entrance to Jerome Avenue on the side of a cliff on a steel structure spanning the tracks of Metro-North's Hudson Line that connected to the existing Putnam Bridge, which had been built for the New York City and Northern Railroad. The station street entrance and mezzanine was above the tracks on Sedgwick Avenue. The west end of the platforms on the steel structure were constructed of wood. The east end of the concrete platforms extended into the tunnel for about a car length. A connecting passageway and stairways from the west end of the northbound platform led to the platforms on the New York Central Hudson Division tracks to permit transfers to that division's trains.[4] The station site, in 2010, has ruins of the platforms and the track-bed into the tunnel entrance on Sedgwick Avenue.

The tunnel from Sedgwick Avenue to Anderson–Jerome Avenues was built to NYC Elevated Railway standards. Those standards specified the clearance between the tracks and the sides of the tunnel only allowed for the "El" type open third rail instead of the covered third rail in use on the IRT Subway. The standard distance from the center of the track to the center of the El type open third rail-head is a few inches shorter than the distance to the subway type covered third rail-head. This incompatibility prevented the line from being used in the future by standard IRT Subway equipment, and brought about the line's demise instead of being linked to the IRT Jerome Avenue Line at 167th Street in The Bronx and the IRT Lenox Avenue Line at Harlem–148th Street in Manhattan, which had been proposed by the New York City Board of Transportation in 1940. A footbridge to West 161st Street remains.

gollark: Although yes, you probably can't have everyone run large customer facing businesses.
gollark: Approximately, sure. But with higher skilled jobs. And you could still have offices and whatnot if your contract included coming in to physically work with people.
gollark: > cuz if everyone would run a business things wouldnt go well(responding to this)
gollark: Not under the current model of work, but you could replace "go to work and are paid to do whatever is directed by someone" with "hired on contract to perform some specific task".
gollark: Um, very late, but stuff probably could still work fine if everyone was self-employed in some way.

References

Preceding station New York Central Railroad Following station
Former services
Highbridge
toward Peekskill
Hudson Division 138th Street
toward New York
Highbridge
toward Brewster
Putnam Division 155th Street
Terminus
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.