Santander railway station

Santander railway station, also known as Santander ADIF to distinguish it from the Santander Feve station, is the main railway station of the Spanish city of Santander, Cantabria. It opened in 1858 and served over 3 million passengers in 2018. The station is actually a complex of two stations, one serving Renfe Iberian-gauge railways, and another adjacent serving FEVE metre-gauge services to Bilbao-Abando and Oviedo.

Santander
Main façade of the ADIF station
LocationSantander, Cantabria, Spain
Coordinates43.4591°N 3.8114°W / 43.4591; -3.8114
Owned byAdif
Operated byRenfe
Line(s)
  • Palencia–Santander
History
Opened11 October 1858
Traffic
Passengers (2018)3,072,339 ()[1]

Services

ADIF

Alvia services use the Madrid–León high-speed rail line as far as Palencia, and switches to the conventional rail network to serve Santander, and one Media Distancia service operates on the classic line between Santander and Valladolid-Campo Grande. The Cercanías Santander commuter rail line also begins at the station.

Preceding station   Renfe Operadora   Following station
Torrelavega
AlviaTerminus
Torrelavega
toward Alicante
Alvia
Torrelavega
toward Madrid Chamartín
  Intercity   Terminus
Renedo
Media Distancia
20
Terminus
Preceding station   Cercanías Santander   Following station
Valdecilla
toward Reinosa
  C-1   Terminus

FEVE

Santander FEVE station building

The metre-gauge Feve Services from Santander link it with Liérganes and Cabezón de la Sal as a commuter service, and regional services to Oviedo and Bilbao. The Transcantábrico tourist train also stops here.[2]

Preceding station   Renfe Feve   Following station
Adarzo
toward Oviedo
  Regionales
R-2
  Terminus
Terminus   Regionales
R-3
  Valdecilla
toward Bilbao-Concordia
Preceding station   Cercanías Santander   Following station
Valdecilla
toward Cabezón de la Sal
  C-2f   Terminus
Valdecilla
toward Liérganes
  C-3f  
gollark: I assume that's of the adult population.
gollark: 48.4% of people have had one or more dose, yes.
gollark: 50% or so first+ dose coverage.
gollark: I have to admit I have been impressed by the surprising competence of the government in rolling out vaccines, if little else.
gollark: Well, he did get elected somehow, this is unsurprising.

References

  1. "Adif - Información de estaciones - SANTANDER". ADIF. Retrieved 3 September 2019.
  2. greenspain extract: "The remaining 650 km to the Atlantic coast are on the network of the FEVE" (Op the Google Map (See ) the distance is calculated at 641 km, estimated margin of error 0,5%).


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.