Rhein-Sieg-Express

The Rhein-Sieg-Express is a Regional-Express service in the German state of North Rhine-Westphalia and Rhineland-Palatinate running from Aachen via Düren, Cologne, Troisdorf, Siegburg and Betzdorf to Siegen. It is operated by DB Regio NRW.

RE 9 Rhein-Sieg-Express
Overview
LocaleNorth Rhine-Westphalia
Technical
Line length171 km (106 mi)
Operating speed140 km/h (87 mph) (maximum)
Route number
  • 480 (Aachen–Cologne)
  • 460 (Cologne–Siegen)
Route map

0
Aachen Hbf
2
Aachen-Rothe Erde
Eilendorf
(until 12/2009)
10
Stolberg (Rheinl) Hbf
13
Eschweiler Hbf
Nothberg
(until 12/2009)
21
Langerwehe
31
Düren
52
Horrem
67
Köln-Ehrenfeld
70
Köln Hbf
THA, ICE, IC
71
Köln Messe/Deutz
ICE
80
Porz (Rhein) (since 12/2010)
90
Troisdorf
95
Siegburg/Bonn
ICE
102
Hennef (Sieg)
114
Eitorf
121
Herchen
129
Schladern (Sieg)
136
Au (Sieg)
NRW / RLP border
142
Wissen (Sieg)
154
Betzdorf (Sieg)
156
Kirchen
165
Niederschelden
RLP / NRW border
171
Siegen
(last station since 12/2010)
NRW / Hesse border
196
Haiger
203
Dillenburg
209
Herborn (Dillkr)
232
Wetzlar
244
Gießen
IC
Source: German railway atlas[1]

History

RE 9 service to Aachen in Nothberg

Regional Express (RE) line 9 has existed since the introduction of the integrated timetable (German: integralen Taktfahrplan, ITF) in North Rhine-Westphalia in 1998. Previously one train ran each day over the line to Mönchengladbach from Gießen to Kaldenkirchen.

From 1998 the train service ran on the route from Krefeld via Neuss, Cologne, Siegburg and Siegen to Gießen. The service used old rolling stock, consisting of class 111 locomotives hauling five double-deck carriages. At the introduction of the next stage of the integrated timetable (ITF2) in December 2002, the line was the most vulnerable to delay in North Rhine-Westphalia. The causes of these delays were the single track sections of the Sieg Railway, work in connection with the completion of the Cologne–Frankfurt high-speed line and the upgrading of the Sieg Railway for S-Bahn operations, speed restrictions between Cologne and Krefeld and a very short turnaround time in Krefeld of 12 minutes.

As a result, in December 2003, the sections of line west of the Rhine of the Rhein-Sieg-Express and the Rhein-Münsterland-Express (RE 7) were swapped. The Rhein-Sieg-Express now runs from Cologne to Aachen, making the timetable more stable.

Three public transport associations are involved in the operation of the Rhein-Express: the Zweckverband Nahverkehr Rheinland (local transport association of Rhineland, NVR), SPNV Rheinland-Pfalz Nord (transport association of northern Rhineland-Paltinate) and the Zweckverband Nahverkehr Westfalen-Lippe (local transport association of Westphalia-Lippe). They called for tenders for its continued operations after December 2010 to be submitted by 30 January 2008.[2][3] In April 2008 it was announced that DB Regio Rheinland (formerly DB Heidekrautbahn, which was established in Potsdam for an unsuccessful bid for services in the Berlin area) would operate the line from 12 December 2010 for 15 years.[3] Therefore, services are to be operated with a total of 15 electric multiple units of the E-Talent 2 variety of the Bombardier Talent called class 442. There will be three three-carriage, ten four-carriage and two five-carriage sets. Since its contract with the North Rhine-Westphalia transport associations was terminated by Rhein-Main-Verkehrsverbund (Rhine-Main transport association) the Rhein-Sieg-Express has terminated since 12 December 2010 in Siegen. Since then the Siegen–Gießen section has been operated only with Hessische Landesbahn trains as services RE 99 and RE 40. However, deliveries of E-Talent 2 to DB Regio Rheinland have been delayed. Since December 2010, the service has been operated under the RSX brand.[4] The new vehicles were first delayed until the second half of 2011,[5] but are now not expected to be available before December 2011.[6] Until then, the line is being operated by conventional double-deck carriages sandwiched between two class 111 locomotives.

DB Regio Rheinland took over DB Regio NRW in August 2011 and became the operator of the service.[7]

Route

RE 9 in Aachen
RE 9 to Siegen in Nothberg

The train leaves every hour from Aachen station on the Cologne–Aachen high-speed line to Cologne station. This section is also part of the route of the NRW-Express (RE 1) and together both lines operate services at approximately 30-minute intervals.

From Cologne, the Rhine-Sieg Express follows the Sieg Railway along the Sieg to Siegen. In Siegen there is a regular connection with the Main-Sieg-Express (RE 99) towards Gießen and Frankfurt. In addition connections exist to the Rothaar Railway (RB 93) to Bad Berleburg and to the Ruhr-Sieg-Express (RE 16) to Essen.

The frequency of services of the Rhine-Sieg-Express on the Sieg Railway is increased during the peaks. In the morning two extra trains run to Cologne and in the afternoon two extra trains run from Cologne towards Siegen. These additional trains run between Au (Sieg) and Siegen with stops in Etzbach, Niederhövels, Scheuerfeld and Brachbach. Between Cologne and Au they also stop in Dattenfeld and Rosbach.

gollark: The reason you're banned?
gollark: So there are a few issuse.
gollark: Unfortunately I expose a lot of stuff to the sandbox, and some of that has security holes.
gollark: I do sandboxing, using the weird Lua quirk which is environments.
gollark: Oh no, potatOS is very secure, and *not* through obscurity.

See also

References

  1. Eisenbahnatlas Deutschland (German railway atlas). Schweers + Wall. 2009. ISBN 978-3-89494-139-0.
  2. Informationen zum abgeschlossenen Ausschreibungsverfahren des Rhein-Sieg-Express "Rhein-Sieg-Express" Check |url= value (help) (in German). Nahverkehr Rheinland. Retrieved 22 July 2011.
  3. "Das europaweite Ausschreibungsverfahren ist endgültig abgeschlossen" (in German). NWL. Archived from the original on 4 June 2011. Retrieved 22 July 2011.
  4. "Änderungen zum nächsten Fahrplanwechsel im AVV" (in German). Eisenbahnjournal Zughalt.de. 11 July 2010. Retrieved 22 July 2011.
  5. "Beim neuen Rhein-Sieg-Express kommt es zu Verzögerungen" (in German). Eisenbahnjournal Zughalt.de. 30 May 2010. Retrieved 22 July 2011.
  6. "Zum Fahrplanwechsel im Dezember 2011 noch keine Talent 2 auf dem RE 9". Eisenbahnjournal Zughalt.de. 10 October 2011. Retrieved 23 November 2011.
  7. "Kompetenz im Schienenpersonennahverkehr" (in German). Deutsche Bahn. Retrieved 26 March 2012.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.