Phoenix Convention Center

The Phoenix Convention Center is an events venue in Phoenix, Arizona. It opened in 1972 and hosts national and regional conventions and trade shows as well as consumer events and theatrical productions.

Phoenix Convention Center
Address100 N. 3rd Street
Phoenix, Arizona 85004
United States
Coordinates33°26′57.65″N 112°4′9.10″W
OwnerCity of Phoenix, Phoenix Convention Center and Venues Department
BuiltOriginal construction began in 1969
OpenedFirst Opened in 1972
South Building opened 1985
North Building opened 2009
West Building opened 2006
RenovatedSouth Building Renovated in 2008
Enclosed space
  Total space900,000 sq. ft.
  Exhibit hall floor312,500 sq. ft.
  Breakout/meeting150,000 sq. ft.
  Ballroom45,000 sq. ft.
Parking8000 spaces
Public transit accessConvention Center
Website
Official Site

History

Exterior of the Convention Center (2009).

The concept for a performing arts auditorium developed as early as 1959. At that time, cultural and theatrical events were being held in outdated high school auditoriums. It was determined that the Phoenix metropolitan area would benefit, not only from having an entertainment facility, but also from a facility that could accommodate regional and national convention business.

A citizens group was formed in the early 1960s to study the development of a convention center and the idea for Phoenix Civic Plaza became reality. In 1963, in order to finance construction, the non-profit Phoenix Civic Plaza Building Corporation was created. On April 15, 1969, the city of Phoenix and Phoenix Civic Plaza Building Corporation signed legal agreements for the initial construction of the convention center.

The Phoenix Civic Plaza Department was created in November 1969 to oversee the operational aspects of the construction, purchase equipment and hire and train staff. Construction of Phoenix Civic Plaza began the same year and was completed in 1972 at a cost of $28 million and occupying 16.5 acres (67,000 m2). The original project included Phoenix Symphony Hall, which opened at the same time.

Six years later, the demand for additional space created a need for expansion. During that time, several conventions were bumped because of previous commitments and conflicting dates. When construction was completed in 1985, Phoenix Civic Plaza had more than doubled its available space to over 300,000 square feet (28,000 m2).

In the mid-1990s Phoenix Convention Center embarked on a $32 million renovation project to update and enhance its image and keep the facility competitive for convention and trade show business.

Recent expansion

The lobby inside the west building.
Construction of the new wing (left) adjacent to the existing West Building of the Convention Center (right).

A multi-phased $600 million expansion project has nearly tripled the size of the Phoenix Convention Center, making it one of the top 20 convention venues in North America. Phase I opened in 2006, with Populous as the design architect and Leo A. Daly as the prime and managing architect. Populous served as both design architect and architect of record for Phase II of the expansion, which was completed in 2008.

The design of the new convention center aims to reference the unique Arizona landscape. Steel canopies extend over third Street to create shade. The large glass and stone atrium in the West Building represents the unique angles and light of an Arizona slot canyon. Colors, textures and finishes capture the warm hues of the Sonoran Desert and the cool tones of an Arizona desert sky.

gollark: specter of communism
gollark: Both!
gollark: oh be/
gollark: specter of communism
gollark: ++magic py```pythonembed = discord.Embed(title="Title", description="Desc\nSeveral apioforms deployed", color=0x00ff0f).set_thumbnail(url="https://media.discordapp.net/attachments/457999277311131649/772461444646174740/ferris.png")await ctx.send(embed=embed)```

See also

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.