Overlap (railway signalling)

An overlap in railway signalling is the length of track beyond a stop signal that is proved to be clear of vehicles in the controls of the previous signal, as a safety margin.

Overview

Enough braking distance is provided to allow a train to comfortably stop at the stop signal, but should it fail to do so for any reason (fog, smoke, slippery rails, brake failure, inattention by driver, etc.) there is still some distance to allow the train to stop short of any obstruction, such as another train.

Length

The length of an overlap may be a nominal length, or else calculated on the full emergency braking distance for the gradients and speeds for that particular section of line.

Two signal protection

If the overlap is long enough to extend from one stop signal to the next, then the effect is to provide two signal protection (or "double blocking"), with the first signal having a full overlap, and the second signal having a short overlap.

With two signal protection, only one track circuit is needed between successive signals. However, overlaps may then be longer than is necessary with an adverse effect on headway, should headway be important on that section of line.

With one signal protection, there may be two track circuits between successive signals, which has a cost, however headways can be optimised.

Country practice

Overlap design vary widely with signalling practice in different countries and types of AWS and ATP. Many countries do not use overlaps at all.

Germany

In Germany the following distances before entry to a station or another critical point are used:[1]

Maximum
Speed
Required
Overlap
> 60 km/h200 m
≤ 60 km/h100 m
≤ 40 km/h50 m
≤ 30 km/h0 m

United Kingdom

(Typical values)

  • Mechanical Signalling - 440 yards (402m)
  • 3-aspect colour lights - 330 yards (300m)
  • 4-aspect colour lights - 220 yards (200m)
gollark: If you're lazy, just make a 2KB array and hope nobody notices.
gollark: It would be easy with haskellomancy too.
gollark: Ïnput/Øutput.
gollark: Maybe add stuff for ÏØ.
gollark: Do you know whether this is turing-complete?

References

  1. Haldor Jochim, Frank Lademann: Planung von Bahnanlagen. Grundlagen - Planung - Berechnung, Hanser Verlag, 2008, ISBN 978-3-446-41345-0


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.