Olimpijski Bazen Otoka

Olimpijski Bazen Otoka is an indoor water arena in Sarajevo, Bosnia and Herzegovina. It is located in the Novi Grad district. Construction was finished in 2008, making it the first olympic sized swimming pool in Sarajevo. Construction started in 2005. The main pool has a dimension of 50 times 25 meters, with a depth of 2.2 meters. There are 10 lanes. There is an additional smaller pool in this building.[1] The main pool is in regulations with FINA requirements.

Olimpijski Bazen Otoka
LocationSarajevo, Bosnia and Herzegovina
Capacity558
Surface3,600 meters^2
Construction
Broke ground2005
Opened2008
Construction cost15.5 million KM
Tenants
VK Bosna

The construction cost was 15.5 million convertible marks, 11.5 came from city Sarajevo, 3.5 from Canton Sarajevo, and 1 million came from the BH Government.[2]

References

  1. "Otvoren Olimpijski bazen Sarajevo". 2008-08-28. Retrieved 2010-02-15.
  2. "Olimpijski bazen Otoka - Grad Sarajevo". 2008. Retrieved 2010-02-15.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.