Oil megaprojects (2004)
This page summarizes projects that brought more than 20,000 barrels per day (3,200 m3/d) of new liquid fuel capacity to market with the first production of fuel beginning in 2004. This is part of the Wikipedia summary of Oil Megaprojects—see that page for further details. 2004 saw 24 projects come on stream with an aggregate capacity of 3.357 million barrels per day (533,700 m3/d) when full production was reached (which may not have been in 2004).
Quick Links to Other Years
Overview | 2003 | 2004 | 2005 | 2006 | 2007 | 2008 | 2009 | 2010 | 2011 | 2012 | 2013 | 2014 | 2015 | 2016 | 2017 | 2018 | 2019 | 2020 |
Detailed Project Table for 2004
Country | Project Name | Year startup | Operator | Area | Type | Grade | 2P resvs | GOR | Peak Year | Peak | Discovery | Capital Inv. | Notes |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
OPEC | |||||||||||||
Algeria | Rhourde Oulad Djemma | 10/2004 | ENI | 0.3 | 2005 | 80 | [1][2][3] | ||||||
Indonesia | Banyu Urip | 2004 | ExxonMobil | 2.0 | 165 | ||||||||
Indonesia | Belanak | 2004 | ConocoPhillips | 2.0 | 35 | ||||||||
Iran | Doroud | 2004 | Total | 2006 | 85 | [4][5] | |||||||
Kuwait | Sabriya (GC23 Capacity Upgrade) | 2005 | KOC | 4.3 | 65 | [6][7][8] | |||||||
Libya | Elephant NC-174 | 2/2004 | Eni | 0.760 | 2008 | 150 | [9] | ||||||
Qatar | Al Khaleej Ph 1 | 9/2004 | ExxonMobil | NGL | 40 | [10][11] | |||||||
Qatar | RasGas 3 | 2/2004 | NGL | 30 | [12] | ||||||||
Saudi Arabia | Qatif Field/Abu-Safah | 12/2004 | Saudi Aramco | 690 | |||||||||
Venezuela | Hamaca Upgrader | 8/2004 | Chevron | 2.0 | 2005 | 180 | $3.8b | [14][15] | |||||
Non-OPEC | |||||||||||||
Angola | Block 15 Kizomba A (Chocalho; Hungo) | 8/2004 | ExxonMobil | ODW | Crude | 1.0 | 250 | [12][16] | |||||
Australia | Bayu-Undan | 2004 | ConocoPhillips | 9/2004 | 200 | 1995 | [15] | ||||||
Brazil | Barracuda (P-43) | 12/2004 | Petrobras | 0.770 | 2005 | 150 | [17][18][19] | ||||||
Brazil | Marlim Sul (FPSO-MLS) | 6/2004 | Petrobras | 2.679 | 100 | [18] | |||||||
Chad | Bolobo | 2004 | 2005 | 60 | [12] | ||||||||
China | Caofedian | 7/2004 | Kerr McGee | 0.7 | 2005 | 100 | [20][21] | ||||||
Syria | Oudeh | 2004 | Tanganyika | 30 | [22] | ||||||||
United States | Front Runner | 10/2004 | Murphy Oil | ODW | Crude | 0.15 - 0.2 | 2005 | 60 | 2001 | [23] | |||
United States | Llano | 4/2004 | Shell | ODW | 0.04 | 5/2004 | 32 | 12/1998 | 0.215 | [25] | |||
United States | Glider | 7/2004 | Shell | ODW | 20 | [26] | |||||||
United States | Magnolia | 2004 | ConocoPhillips | 0.150 | 2005 | 50 | 1999 | [27][28] | |||||
United States | Marco Polo (inc K2, Genghis Khan) | 7/2004 | Anadarko Petroleum | 120 | [29][30] | ||||||||
UK | GoldenEye | 10/2004 | Shell | OFF | Cond | 0.135 | 2005 | 30 | [12][31] | ||||
Yemen | East Al Hajr (blk 51) | 2004 | Nexen | Crude | 25 |
See also the 2004 world oil market chronology
This table is available in csv format here (updated daily).
gollark: Do you want the bee density of just the lower atmosphere, or the entire region from space to core corresponding to America?
gollark: That is denied by the standard.
gollark: I mean, do you want me to use the *unofficial* ones, palaiologososos?
gollark: I don't have big enough SI prefixes to express the bee populations of an entire *continent*.
gollark: Go produce a bee tesseract.
References
- "BHP Commits to Major Oil Development in Algeria, BHP Press Release, 6/22/2000".
- "BHP BILLITON PRODUCTION REPORT FOR THE QUARTER ENDED 31 DECEMBER 2004" (PDF).
- "BHP BILLITON PRODUCTION REPORT FOR THE QUARTER ENDED 30 JUNE 2006" (PDF).
- "OPEC Upstream Investments Plans, Accessed 12/10/07". Archived from the original on 2007-12-27.
- "Offshore Company Plans to Develop Offshore Oil Fields, PetroEnergy Information Network, 3/28/06, Accessed 12/10/07". Archived from the original on 2007-10-24. Retrieved 2007-12-11.
- "Petrofac to Replace North Kuwait Oil Export System, Press Release, 4/30/05".
- "Kuwait Oil Company, 29th Annual Report, 2003-2004". Archived from the original on 2007-12-11. Retrieved 2007-12-11.
- "Gathering Centres in KOC Oil Fields, Kuwait Oil Company, viewed December 17, 2007".
- "Libya Reserves, Geology, NOC, Companies, EIA Country Analysis Brief, Accessed 12/11/07". Archived from the original on 2007-12-01.
- "Exxon Financial and Operating Review, 2005" (PDF).
- "Total 2004 Annual Report" (PDF). Archived from the original (PDF) on 2008-05-16. Retrieved 2007-12-11.
- "ExxonMobil Financial and Operating Review, 2004" (PDF). Archived from the original (PDF) on 2007-07-06. Retrieved 2007-12-11.
- "A Nose Dive Towards the Desert".
- "ChevronTexaco Announces Completion of Hamaca Crude Upgrading Facility; Production to Ramp Up in Fourth Quarter, Press Release, 8/25/04".
- "ConocoPhillips Annual Report, 2004". Archived from the original on 2008-01-16. Retrieved 2007-12-11.
- "Kizomba A and B: Projects Overview, Offshore Technology Conference, May 2006" (PDF). Archived from the original (PDF) on 2007-01-08. Retrieved 2007-12-11.
- "Barracuda Achieves First Oil Production, Rigzone, 12/22/2004".
- "Petrobras Annual Report, 2004" (PDF).
- "Deep developments taking shape, Offshore Engineer, 9/1/2004". Archived from the original on 2008-01-27. Retrieved 2007-12-11.
- "Bohai Oilfield raises output, Alexander's Oil and Gas Connections, 9/17/04". Archived from the original on 2007-12-09. Retrieved 2007-12-11.
- "Kerr McGee Annual Report, 2005" (PDF).
- "Tanganyika achieves first oil production from Syrian field". Archived from the original on 2007-12-09. Retrieved 2007-12-11.
- "2003 Annual report" (PDF).
- "Project: Front Runner".
- "Field Description:Llano, Rigzone, Accessed Dec 7th, 2007".
- "Glider Takes Flight, Oil Online, Accessed Dec 7th, 2007". Archived from the original on 2008-01-27. Retrieved 2007-12-11.
- "Magnolia on its marks". Archived from the original on 2008-01-27. Retrieved 2007-12-11.
- "ConocoPhillips Annual Report, 2004". Archived from the original on 2008-01-16. Retrieved 2007-12-11.
- "Field Profile: Marco Polo, Rigzone, accessed 12/9/07".
- "BHP BILLITON QUARTERLY REPORT ON EXPLORATION AND DEVELOPMENT ACTIVITIES QUARTER ENDED 30 SEPTEMBER 2007, BHPBilliton" (PDF).
- "Production starts at Shell operated Howe field in the North Sea". Archived from the original on 2007-12-09. Retrieved 2007-12-11.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.