Ohio State Route 585
State Route 585 (SR 585) is a north–south (physically northeast-southwest) state highway in the northeastern portion of the U.S. state of Ohio. The southern terminus of State Route 585 is at the SR 3/SR 83 concurrency in Wooster. The northern terminus of this state route is an interchange with SR 21 in Norton, where Wooster Road then continues to the northeast into Barberton.
Route information | ||||
---|---|---|---|---|
Maintained by ODOT | ||||
Length | 19.94 mi[1] (32.09 km) | |||
Existed | 1969[2][3]–present | |||
Major junctions | ||||
South end | ||||
North end | ||||
Location | ||||
Counties | Wayne, Summit | |||
Highway system | ||||
|
Route description
The path of SR 585 takes it through the northeastern quadrant of Wayne County and just into the southwestern part of Summit County. There are no segments of State Route 585 that are included as a part of the National Highway System, a network of highways deemed most important for the economy, mobility and defense of the country.[4]
The interchange with SR 21 has an unusual configuration. It is a hybrid cloverstack interchange with a left-hand flyover ramp from eastbound SR 585 to northbound SR 21. Eastbound Wooster Road just west of the interchange crosses the ramp from eastbound SR 585 to southbound SR 21 at-grade and merges with the loop ramp from southbound SR 21 to eastbound Wooster Road.
History
SR 585 was first designated in 1969. This designation replaced what was a portion of SR 5 up until that year, running from an interchange with SR 3 and what was then designated SR 76 (now SR 83) on the east side of Wooster northeasterly to an interchange with what was then US 21 (currently SR 21) in Norton. SR 585 has not experienced any major changes to its routing since its inception.[2][3]
Major intersections
County | Location | mi[1] | km | Destinations | Notes |
---|---|---|---|---|---|
Wayne | Wooster | 0.00 | 0.00 | Southern terminus of SR 585 | |
Milton–Chippewa township line | 12.17 | 19.59 | |||
Chippewa Township | 13.90 | 22.37 | Southern end of SR 94 concurrency; eastern terminus of SR 604 | ||
14.76 | 23.75 | Northern end of SR 94 concurrency | |||
16.47 | 26.51 | CR 70 (Doylestown Road / Collier Drive) | One-quadrant interchange | ||
Summit | Norton | 19.27 | 31.01 | Hametown Road | Partial cloverleaf interchange; no direct access to eastbound SR 585 / Wooster Road |
19.94 | 32.09 | Hybrid cloverstack interchange; extra ramp indirectly provides Hametown Road interchange's missing movement; northern terminus of SR 585; roadway continues as Wooster Road | |||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
References
- Ohio Department of Transportation. "Technical Services Straight Line Diagrams". Retrieved 2010-07-01.
- Official Ohio Highway Map (MrSID) (Map). Cartography by ODOH. Ohio Department of Highways. 1967. Retrieved 2011-01-27.
- Official Ohio Highway Map (MrSID) (Map). Cartography by ODOH. Ohio Department of Highways. 1969. Retrieved 2011-01-27.
- National Highway System: Ohio (PDF) (Map). Federal Highway Administration. December 2003. Retrieved 2011-01-27.