Nordumgehung Pasing

The Nordumgehung Pasing is a bypass that leads around the center of Pasing and the Bundesstraße 2 (federal highway).

Josef-Felder-Straße (on the right of the new Pasinger train station building and the Pasing Arcaden, to the left of the tracks)

Background

The B2, which provides Munich with an important north-south connection, represents one of the main access roads of the Bavarian state capital. In the western district of Pasing, it leads along the Bodenseestraße, the Pasinger Marienplatz and the Landsberger Straße to the Bundesstraße 2 R, the middle ring. Every day about 80,000 vehicles cross through Pasing via the B2.

To relieve the pressure on the center of Pasing and its pedestrian-friendly design, the B2 was swiveled and routed through the Nordumgehung Pasing (NUP). This new bypass, whose construction was started in 2008, was opened to traffic in 2012.[1]

Route

The Nordumgehung Pasing shears west of the town center from the previous road to the north, following the Lortzingstraße and continues south along the train lines to the east. The train station and the Offenbachstraße are crossed using previously existent freight and industrial areas, until the road turns to the south and meets the Landsberger Straße. The Landsberger Straße is to be separated in east-west direction at the Pasinger Marienplatz, so that connecting traffic is to be expected only in this section; the load on the central section should be only between 2,000 and 10,000 vehicles a day.[2] The relieved from traffic, Pasinger Marienplatz, is then to be redesigned, to which a pedestrian zone is to be provided between Pasinger station square and Landsberger Straße in Gleichmannstraße and Bäckerstraße.

The Nordumgehung is to run above ground in the area of the Munich Pasing station between the terminal building and platforms, with taxi ranks and a Kiss & Ride lane to be provided in the terminal building.[3]

The newly created road between Landsberger Straße / Am Knie and Lortzingstraße was named Josef-Felder-Straße after a decision of the city council on 1 October 2009.[4]

gollark: You could probably vaguely look at what it looks like, but NAND flash is just going to be a big grid of capacitors or whatever, and you will know very little about how it's made.
gollark: I doubt you could do anything with them even if you have them.
gollark: I see. If it is now multithreaded and running into power limits you should get advantages out of running it on better hardware somewhere.
gollark: Surely there are other ways to do that.
gollark: I'll schedule researching this for 3 or more or fewer days from now then.

References

  1. "Neue Trasse für Durchgangsverkehr mit Verkehrsfreigabe Ende 2012" (in German). Landeshauptstadt München. Retrieved 9 July 2018.
  2. "Pasing Zentrum Gestaltung von Straßen und Plätzen" (PDF) (in German). Landeshauptstadt München Baureferat. Retrieved 9 July 2018.
  3. "Neugestaltung von Straßen und Plätzen" (in German). Landeshauptstadt München. Retrieved 9 July 2018.
  4. "Josef-Felder-Straße" (in German). Landeshauptstadt München. Retrieved 9 July 2018.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.