New Sig Stadium
New Sig Stadium is a 20,000-seat stadium currently under construction in Sig, Algeria. It is due to open in 2018.[1]
Location | Sig, Mascara, Algeria |
---|---|
Coordinates | |
Owner | CC Sig |
Operator | Ministry of Youth and Sport |
Capacity | 20,000 |
Field size | 105 x 68 m |
Surface | Grass |
Construction | |
Broke ground | 2013 |
Opened | July 2020 (planned) |
Construction cost | €10,028 million |
Builder | sarl MEZZOUGHI, ETOSA |
Tenants | |
CC Sig |
Stadium
Construction
The stadium was launched in 2013 with a capacity of 20,000 spectators by an Algerian company, and will be on the English method without a track and fully covered and is expected to host some of the football games in the 2021 Mediterranean Games. This stadium has many facilities, The secondary playground is dedicated to athletics with 1000 seats, a covered hall with 500 seats and an Olympic swimming pool. The work of the four sports structures of this pole occupies 13 hectares, It has been supported by a variety of service facilities, including a gymnasium, café and restaurant.[2]
Handover and opening
gollark: How Apple of Apple.
gollark: There are, IIRC, ways to make VMs which most stuff won't detect as virtual, but then you lose performance a lot.
gollark: Really? If so, that's very Apple.
gollark: I like the new logo, it has a nice color.
gollark: What could POSSIBLY go wrong?
See also
References
- "زيارة السيد الوالي الى المشاريع التنموية ببلدية سيق". wilayademascara.org. Retrieved 17 February 2017.
- "تأخر أشغال مشروع القطب الرياضي لسيڤ يحرك والي معسكر". djazairess.com. Retrieved 31 May 2019.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.