Naval Outlying Field Goliad

Naval Outlying Field Goliad (ICAO: KNGT, FAA LID: NGT) is a military airport located five nautical miles (6 mi, 9 km) north of the central business district of Berclair, Texas, in Goliad County. It is owned by the United States Navy.[1] The airfield has two runways, both 8000 feet long by 150 feet wide. Its mission is to support operations of the Naval Air Training Command, specifically Commander, Training Air Wing FOUR located aboard Naval Air Station Corpus Christi. It is under the control of Commander, Navy Region Southeast.

Naval Outlying Field Goliad
Summary
Airport typeMilitary
OwnerUS Navy
LocationBerclair, Texas
Elevation AMSL324 ft / 99 m
Coordinates28°36′42″N 097°36′45″W
Map
NGT
Runways
Direction Length Surface
ft m
11/29 8,000 2,438 Asphalt/Concrete
17/35 8,000 2,438 Asphalt

History

Goliad NOLF was originally built by the United States Navy in the 1970s as Chase Naval Air Station Auxiliary Landing Field Berclair and served as an auxiliary airfield for flight training operations at Naval Air Station Chase Field near Beeville, Texas. The airfield was closed as a result of the 1993 Base Realignment and Closure Commission that also resulted in the closing of NAS Chase Field. Goliad County purchased the airfield from the U.S. Navy for $1 in 1999 as surplus property and redeveloped the property as Goliad County Industrial Airpark (FAA LID: 7T3), which was a county-owned, public-use airport. The airport was included in the National Plan of Integrated Airport Systems for 2011–2015, which categorized it as a general aviation facility.[2] The United States Navy repurchased the field from Goliad County in 2011 for $2.3 million.[3]

Facilities

NOLF Goliad covers an area of 1,136 acres (460 ha) at an elevation of 324 feet (99 m) above mean sea level. It has two runways: 11/29 is 8,000 by 150 feet (2,438 x 46 m) with an asphalt and concrete surface; 17/35 is 8,000 by 150 feet (2,438 x 46 m) with an asphalt surface.

gollark: In any case, if you have a planned system and some new need comes up... what do you do, spend weeks updating the models and rerunning them? That is not really quick enough.
gollark: If you want to factor in each individual location's needs in some giant model, you'll run into issues like:- people lying- it would be horrifically complex
gollark: Information flow: imagine some farmer, due to some detail of their climate/environment, needs extra wood or something. But the central planning models just say "each farmer needs 100 units of wood for farming 10 units of pig"; what are they meant to do?
gollark: The incentives problems: central planners aren't really as affected by how well they do their jobs as, say, someone managing a firm, and you probably lack a way to motivate people "on the ground" as it were.
gollark: What, so you just want us to be stuck at one standard of living forever? No. Technology advances and space mining will... probably eventually happen.

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.