Mission Bridge

The Mission Bridge is a steel girder bridge across the Fraser River, linking the District Of Mission to the City of Abbotsford, British Columbia, Canada. The bridge measures 1,126.2 m (3,695 ft) long and carries four lanes of British Columbia Highway 11. The bridge is the only fixed road crossing between Maple Ridge and Agassiz.

Mission Bridge
Coordinates 49°07′24″N 122°18′22″W
Carries4 lanes of British Columbia Highway 11
CrossesFraser River
LocaleMission and Abbotsford, British Columbia
Characteristics
DesignGirder bridge
MaterialSteel
Total length1126m (3694ft)
Piers in water19
History
Construction startMay 1969
Construction end1972
Inaugurated11 July 1973

History

Before the Mission Bridge was completed, the only link between the City of Abbotsford and the City of Mission was the CPR's Mission Railway Bridge which had wooden planks laid on the ties between the rails, and outside the rails, to allow the passage of automobile traffic. Due to floods in the 1940s and 1950s, the bridge and surrounding area were becoming inaccessible. This was causing damage to Mission's business centre because a large percentage of the revenue in Mission came from Abbotsford. In order to revitalize business, a more permanent solution was needed. The Mission Bridge project was put into action in May, 1969, with the dredging of the Fraser River's banks.

The construction of the bridge was a large undertaking. Construction of the main span occurred between May 1969 and 1972. It included 19 piers, a four-lane highway and pedestrian/bicycle routes adjacent to the main roadway. The total cost of the project was approximately $13,000,000 (CAD). The Bridge was officially opened on July 11, 1973 by the Premier of British Columbia of the time, Dave Barrett.

Seismic retrofitting

Between 2012 and 2013, the bridge was seismically retrofitted, which included the strengthening of the bridge structure, the installation of a new seismic restraint system, installation of new deck joints, and painting of various components. New cycling railings and cycle approaches valued at $1.5 million were also completed as part of the superstructure improvements.[1]

gollark: I disagree with saying "someone" for non-people entities.
gollark: There are various problems with this:- massive increase of complexity in guns- you would need to recharge it constantly, and it would need batteries and such, and would generally be a hassle- GPS spoofing (possibly just jamming, depending on design) would stop guns working- people could probably just remove the geofencing bit- how are you planning to keep the "do not shoot here" lists updated on all of them?
gollark: I sent this mere *hours* ago.
gollark: Does the particular context of it change the meaning much? Or imply that you should only do that sometimes?
gollark: Language is hard, since it often deals with things which are hard to rigorously define in the first place, is subject to bizarre evolutionary pressures, and is often manipulated for argumentative gain.

See also

References

  1. Infrastructure, Transportation and (2012-05-25). "Final phase of Mission Bridge seismic upgrade underway". news.gov.bc.ca. Retrieved 2019-09-28.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.