The Memorial Tunnel is a 2,802 feet (854 m) two-lane vehicular tunnel that formerly carried the West Virginia Turnpike through/under Paint Creek Mountain in Standard, West Virginia in Kanawha County.[1] Closed to interstate traffic since 1987, the tunnel serves as the Center for National Response for military first responders to train for various situations that may arise in such a location without alarming the general public.[1]

Memorial Tunnel
Overview
LocationStandard, West Virginia, United States
Coordinates38.132852°N 81.414957°W / 38.132852; -81.414957
Operation
Work begun1952
OperatorCenter for National Response
Technical
Length2,802 feet (854 m)

The tunnel's bypass is reminiscent of the Pennsylvania Turnpike bypassing the Laurel Hill Tunnel in 1964, followed by the bypass of the Rays Hill and Sideling Hill Tunnels in 1968.

History

Construction of the Memorial Tunnel commenced in 1952,[2] and it officially opened to traffic on November 8, 1954,[1] at a final cost of $5 million.[3] Its construction required the movement of 91,000 cubic yards (70,000 m3) of earth, and it was the first tunnel in the nation to have closed-circuit television monitoring. At the time, it was called "88 miles of miracle."

Turnpike upgrades

The turnpike became heavily used, and by 1976, upgrades to the Turnpike from two-lanes to four-lanes had commenced; by 1983 all but the Memorial Tunnel had been completed.[2] The remaining tunnel created a bottleneck–the 4-lane, divided highway turnpike had to merge into the two-lane, two-way traffic configuration of the tunnel, which also had a lower speed limit. This resulted in traffic backups during periods of increased traffic, such as holiday travel seasons.

Bypassed

Instead of upgrading and expanding the tunnel, a 1.72 miles (2.77 km) bypass was constructed going around both the tunnel and the Bender Bridge over Paint Creek.[2] Costing $35 million to complete, 10 million cubic yards (7,600,000 m3) of earth were removed in addition to 300,000 tons of coal being removed from the mountain.[2] The last vehicle would pass through the tunnel on July 7, 1987, and it would subsequently close for use for pass-through vehicular traffic.[3]

Alternate use

Between 1992 and 1995, the Department of Transportation entered a deal with the state to utilize the abandoned tunnel for smoke, fire and ventilation experiments.[4] These experiments were carried out to design better developed ventilation systems for the tunnels being constructed as part of the Big Dig in Boston; the results of the tests were also incorporated into the design of the Channel Tunnel.[5] These experiments also resulted in the Federal Highway Administration allowing jet fans for ventilation in tunnel construction, which was a significant change to their original ventilation designs.[4] The lasting legacy of the Memorial Tunnel Fire Test Program is in both changes in ceilings materials used in tunnel construction as well in the approved use of jet fans for ventilation during construction.[6]

By 2000, the tunnel had been selected as the location where the Center for National Response would conduct anti-terrorism training exercises.[5] The current facilities offered in the center include:

  • A rubble area to simulate collapsed buildings[7]
  • An emergency egress trainer[7]
  • A subway station, complete with 800 feet (240 m) of track and two subway cars from Boston's Green Line[7]
  • A drug enforcement section[7]
  • A highway tunnel section, complete with a New York City Transit Authority bus, firetrucks, a tractor-trailer and other vehicles[7]
  • A 50-car pileup wreck complete with hazardous materials

Groups from around the country are sending personnel to West Virginia to train in the facility. In all, about 160,000 first responders have been trained by West Virginians.

gollark: Or I guess you could compile your whole thing including the license verification to bytecode.
gollark: <@154361670188138496> I mean, kind of. Thing is, OmniDisks\™ are basically only useful for getting around PotatOS sandboxing. So if they can't do that the disk is useless.This sort of "only useful in an environment you fully control" sandboxing is the only workable sort.
gollark: It also contains valid disk IDs for each UUID and disk IDs are unique to each disk and unspoofable.
gollark: The program *on* the disks downloads a license info JSON from the interweb when it runs. This contains the features each UUID is allowed to use.
gollark: The program I use to write and sign them also writes on a UUID, which is signed.

See also

References

  1. Center for National Response. "Tunnel History". Archived from the original on 2007-09-30. Retrieved 2008-02-20.
  2. Monday, Christopher R. "The West Virginia Turnpike: "88 miles of miracle"". West Virginia Historical Society Quarterly. Archived from the original on February 12, 2005. Retrieved February 21, 2008.
  3. "Snapshots of the 20th century". The Charleston Gazette. May 14, 1999. p. 15A.
  4. Williams, Susan (April 9, 1998). "Tunnel vision: Fiery, one-of-a-kind experiments saved designers $20 million". The Charleston Gazette. p. 1C.
  5. Lily, Roger (December 18, 2000). "T 'Terrorism' on the Turnpike: Officers train for worst-case scenarios in closed Memorial Tunnel". The Charleston Gazette. p. 1A.
  6. Sergiu F. Luchian. "Memorial Tunnel Fire Test Program" (PDF). Retrieved 2008-02-20.
  7. Steelhammer, Rick (January 19, 2002). "A smashing success: Turnpike tunnel still has value Disaster training site's popularity explodes globally". The Charleston Gazette. p. 1A.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.