Meizhou–Longchuan high-speed railway
The Meizhou–Longchuan high-speed railway is a high-speed railway currently under construction in China.
Meizhou–Longchuan high-speed railway 梅龙高速铁路 | |
---|---|
Overview | |
Status | Under construction |
Termini | Meizhou West Longchuan West |
Stations | 4 |
Operation | |
Opened | 2023 |
Operator(s) | China Railway High-speed |
Technical | |
Line length | 95.6 km (59 mi) |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
Operating speed | 350 km/h (217 mph) |
The line will be 95.6 kilometres (59.4 mi) long when completed and will have a design speed of 350 kilometres per hour (220 mph).
History
Construction officially began on 15 December 2019 and is expected to take four years.[1]
Stations
Station Name | Chinese | China Railway transfers/connections | ||||||||
---|---|---|---|---|---|---|---|---|---|---|
Meizhou West | 每周西 | Meizhou–Chaoshan railway | ||||||||
Xingning South | 兴宁南站 | |||||||||
Wuhua | 五华 | |||||||||
Longchuan West | 龙川西 | Ganzhou–Shenzhen high-speed railway (under construction) |
gollark: I see.
gollark: I have permission for the apioformic videoforms.
gollark: I can ask him if I can submit it though.
gollark: It's not actually made by me, however baidicoot is not on here.
gollark: Fascinating.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.