Light rail in Auckland
Auckland, New Zealand's largest city, is considering introducing light rail lines to replace some of its most heavily used bus routes.[1] Many of these new light rail lines, if built, would run on routes used by Auckland's former tram system.[2]
Overview | |
---|---|
Area served | Auckland, New Zealand |
Transit type | Light rail |
Number of lines | 2 |
Technical | |
System length | 22 km (13.7 mi) (city centre to Airport route) |
History
Background
Auckland was served by a network of traditional tramcar routes with horse-drawn trams (1884–1902) and electric trams (1902–1956).[3][4] The original tram network was 72 kilometres (45 mi) in length at its fullest extent from the mid 1930s until closures began in 1949.[5]
Initial proposal
In 2015, Steve Hawkins, Auckland Transport's Chief Engineer, said that the bus routes on Symonds Street and Fanshawe Street require as many as 150 buses each.[6] The light rail study is considering replacing the bus routes on Dominion Road, Manukau Road, Mt Eden Road, Symonds Street and Queen St with light rail routes. All of those bus routes replaced routes on Auckland's former tram network.
Stuff.co.nz quoted Auckland Transport officials who described how the study was considering the option of building light rail routes with dedicated right of way versus routes where rail vehicles shared the road with other vehicles, as with a traditional streetcar system.[6] Officials projected that the maximum passenger capacity of a true light rail line would be 18,000 passengers per hour, while the maximum capacity of a system where vehicles shared the road with other vehicles would be limited to 12,000 passengers per hour. This compares with a bus on a shared path shifting 2,500 people and a bus on a priority path's 6,000 people an hour.[4]
In 2015, then Auckland Mayor Len Brown pointed out that the city's ten-year plan did not include funding for building new light rail routes.[6]
An eastward line from the airport to Botany Downs has also been proposed with a new interchange at Puhinui railway station, planned to be built in two stages, the first of which is said to be an early deliverable component of the Airport to Botany rapid transit line, planned to be operational by end of 2020 /early 2021. This encompasses a new at-grade bus/rail interchange and enhanced station. Buses will still use the existing local road (Bridge Street) to cross the railway line to/from Manukau, along with local traffic.The second phase provides a rapid transit overbridge across the railway line to provide a more direct and bespoke rapid transit connection. The new rapid transit link will integrate with the new interchange station on the overbridge. The first stage is estimated to cost $59 million to construct.[7] The line will also go through Manukau railway station before ending in Botany.[8][9]
Detailed planning and funding
On 26 April 2018, Mayor Phil Goff and Transport Minister Phil Twyford announced the Auckland Transport Alignment Project 2018 with $NZ28 billion of investment in Auckland transport infrastructure over ten years, including the fast-tracking of light rail to Auckland International Airport.[10][11]
On 9 May 2018, in a pre-Budget announcement, Twyford and Finance Minister Grant Robertson made the surprise announcement that work on two routes would commence immediately, with an open-tender process for funding, construction, and operation of the lines:[12]
- A line from Wynyard Quarter along Queen Street with one route to Auckland Airport via Dominion Road.[12]
- A second line, also travelling along Queen Street, then via Karangahape Road and Great North Road to Westgate via a Northwestern Motorway dedicated light-rail corridor, with extensions indicated to Kumeu and Huapai, running past the currently disused Kumeu and Huapai railway stations on the North Auckland Line. Passenger services on the Western Line do not currently operate north of Swanson and do not serve these stations.[12]
In May 2018, it was announced that the New Zealand Superannuation Fund had expressed an interest in financing, designing, building and operating Auckland's light rail network, in a consortium with CDPQ Infra, a Canadian infrastructure company. The consortium was named NZ Infra.[12]
By early 2019, the cost of the two lines had been estimated at $6 billion, with an underground alignment through Queen St under consideration.[13]
Replacement light metro proposal
In August 2019, Mayor Phil Goff announced that work on the light rail network may begin the following year.[14] The same month, two delivery partners for the project were shortlisted; NZ Infra and NZTA, but it was stated that a 2020 start date would be unlikely.[15] By late 2019, two different types of technology were being considered by the New Zealand Ministry of Transport. The original proposal from the New Zealand Transport Agency consisted of surface level light rail; the other from NZ Super Fund explored fully grade-separated, driverless light metro technology, with an underground alignment through Queen St and elevated sections elsewhere, with fewer stations between the city centre and airport.[16][17]
In May 2020, it was reported that the light rail project had been placed on hold due to the impact of the COVID-19 pandemic in New Zealand.[18] In June, Twyford confirmed that the Ministry of Transport was still committed to the project, but as a fully grade-separated light metro line between the city and airport;[19] stating that "Our policy is that light metro is the form of rapid transit that Auckland needs. We've decided very clearly that we need a rapid transit system that's not competing with pedestrians and other cars in the road corridor. A light metro system just like you see in London, New York, Tokyo, Paris, is actually faster and more efficient. It would allow you to get from Queen St to the Airport in 30 minutes as opposed to the 47 minutes that was projected for the old streetcar model Auckland Transport developed." The Ministry did not release the updated cost of the new light metro proposal, or any time frame for its construction. However industry commentators have estimated the decision to use the metro mode will increase cost of the two lines from $6 billion to more than $20 billion, with a new design and construction period of 8 to 10 years beginning from 2021 at the earliest.[20]
Routes
Proposed light rail network Airport Route | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Proposed light rail network Western Route | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
References
- Barrett, Keith (23 January 2015). "Auckland to launch light rail study". International Railway Journal. Retrieved 27 January 2015.
- "Light rail gets thumbs up from opposition". 3 News. 24 January 2015. Archived from the original on 20 April 2015. Retrieved 27 January 2015.
- Smith, Sandy (27 January 2015). "Beijing to Add Four More Metro Lines". Next City. Retrieved 28 January 2015.
- Thompson, Wayne (25 January 2015). "From apps to zones: Is this how we get city moving?". New Zealand Herald. Retrieved 27 January 2015.
- Dearnaley, Mathew (23 January 2015). "Light rail returns to the spotlight". New Zealand Herald. Retrieved 28 January 2015.
- Slade, Maria (23 January 2015). "Len Brown cool on light rail in Auckland transport plan". Stuff.co.nz. Retrieved 28 January 2015.
- "Airport to Botany Rapid Transit: Puhinui interchange" (PDF).
- "Southwest Gateway Airport to Botany Rapid Transit" (PDF).
- https://at.govt.nz/projects-roadworks/airport-to-botany-rapid-transit/
- "Auckland Transport Alignment Project 2018". Auckland Transport. Retrieved 10 May 2018.
- "Auckland Transport Alignment Project 2018". New Zealand Ministry of Transport/Te Manatu Waka. 9 May 2018. Retrieved 10 May 2018.
- Cooke, Henry (9 May 2018). "NZ Super Fund keen to build and operate Auckland's light rail". Stuff.co.nz. Retrieved 10 May 2018.
- "Trams could run under Queen St as part of Auckland's $6 billion light rail project". NZ Herald. 9 February 2019. Retrieved 25 August 2019.
- "Auckland Light Rail announcement 'soon'". Stuff.co.nz. 1 August 2019. Retrieved 1 August 2019.
- "Two delivery partners shortlisted for Auckland light rail". International Railway Journal. 23 August 2019. Retrieved 25 August 2019.
- "What do we know about the two light rail plans, and is the Super Fund's worth waiting for". Stuff.co.nz. 31 October 2019. Retrieved 2 November 2019.
- "Twyford's dilemma: housing or a fast trip to the airport?". www.newsroom.co.nz. 24 October 2019. Retrieved 2 November 2019.
- Coughlan, Thomas (13 May 2020). "Government puts light rail 'on hold'". stuff. Retrieved 13 May 2020.
- "'Light Metro', not 'Light Rail'". www.newsroom.co.nz. 26 June 2020. Retrieved 26 June 2020.
- "Light Rail dies but Light Metro may return". Greater Auckland. 24 June 2020. Retrieved 26 June 2020.
External links
- Boswell, Ross (12 April 2018). "Auckland has a better option for Airport rapid transit". New Zealand Herald.
- Davison, Isaac (10 May 2018). "Auckland's new rail lines could be ready within six years, but only if Labour is still in power". New Zealand Herald.
- "French tram bid plan - An Alstom executive in Reims tells of his plans for Auckland trams". New Zealand Herald. 31 March 2018.
- Gibson, Anne (31 March 2018). "Auckland tram project to start in two years: Twyford". New Zealand Herald.
- Gibson, Anne (9 May 2018). "How big tram projects can be derailed: Aussie example shows the risks". New Zealand Herald. Retrieved 11 May 2018.
- Jacobson, Adam (26 April 2018). "Auckland Council, Government commit $28b towards Auckland transportation infrastructure". Stuff.co.nz.
- Lee, Mike (1 May 2018). "Trams to the airport is deluded folly". New Zealand Herald.
- Lowrie, Matt (24 April 2018). "Light rail not really about airport". New Zealand Herald.
- Orsman, Bernard (13 April 2018). "Experts say trams won't be running in Auckland until 2025". New Zealand Herald.
- "What you need to know about the $28b Auckland Transport Alignment Project". Stuff.co.nz. 26 April 2018.
- Wilson, Simon (27 April 2018). "In praise of joined-up transport thinking". New Zealand Herald.
- Wilson, Simon (9 May 2018). "NZ Super Fund wants to own and operate two of Auckland's light rail projects". New Zealand Herald. Retrieved 9 May 2018.
- Wilson, Simon (10 May 2018). "Business should be salivating over new light rail lines". New Zealand Herald.