La Yesca Dam is an embankment dam on the Santiago River 90 km (56 mi) northwest of Guadalajara on the border of Mexico's Nayarit and Jalisco states. Construction on the dam began in 2007 after Empresas ICA was awarded the main construction contract. The dam was inaugurated by President Felipe Calderón on 6 November 2012.[2] The dam supports a 750 MW hydroelectric power station and is part of the Hydroelectric System Santiago.[3] Its construction will improve the regulation of water flow and subsequently power generation downstream at the El Cajón and Aguamilpa Dams.[4]

La Yesca Dam
Location of La Yesca Dam in Mexico
Official namePresa Yesca
CountryMexico
LocationLa Yesca
Coordinates21°11′50″N 104°05′44″W
PurposePower, river regulation
StatusOperational
Construction began2007
Opening date6 November 2012
Construction costUS$768 million
Owner(s)Federal Electricity Commission
Dam and spillways
Type of damEmbankment, concrete-face rock-fill
ImpoundsRío Grande de Santiago
Height220 m (722 ft)
Length628 m (2,060 ft)
Elevation at crest579 m (1,900 ft)
Dam volume11,900,000 m3 (15,564,612 cu yd)
Spillway typeService, gate-controlled channel
Spillway capacity15,915 m3/s (562,033 cu ft/s)
Reservoir
Total capacity2,500,000,000 m3 (2,026,783 acre⋅ft)
Active capacity1,392,000,000 m3 (1,128,513 acre⋅ft)
Catchment area51,590 km2 (19,919 sq mi)
Surface area33.4 km2 (13 sq mi)[1]
Normal elevation575 m (1,886 ft)
Power Station
Commission date2012
TypeConventional
Turbines2 x 375 MW Francis-type
Installed capacity750 MW
Annual generation1,210 GWh (planned)

Design

The La Yesca Dam is a 220 m (722 ft) tall and 628 m (2,060 ft) long concrete-face rock-fill embankment type with 11,900,000 m3 (15,564,612 cu yd) of fill. The dam's crest elevation is 579 m (1,900 ft) above sea level and it sits at the head of a 51,590 km2 (19,919 sq mi) catchment area. On the dam's left bank is a spillway controlled by six radial gates. The maximum discharge of the spillway is 15,915 m3/s (562,033 cu ft/s). The dam's reservoir has a capacity of 2,500,000,000 m3 (2,026,783 acre⋅ft) of which 1,392,000,000 m3 (1,128,513 acre⋅ft) can be used for generating electricity. The reservoir has a surface area of 33.4 km2 (13 sq mi) and a normal elevation of 575 m (1,886 ft). The power station contains two 375 MW Francis turbine generators producing an estimated annual generation of 1,210 GWh.[1]

gollark: Are you still going for the ridiculous "I'll buy all my parts over 3 years" thing?
gollark: ```🚨 /home/osmarks/Programming/skynet/node_modules/cbor/lib/map.js: unknown Statement of type "ForOfStatement"```
gollark: I'm trying to get the CBOR library skynet uses to run, but due to the stupidity of all JS tooling the compiler just outputs a ridiculous error.
gollark: Parcel is a nice zero-configuration bundler, except the zero-configuration approach and the fragility of the JS ecosystem means it just broke for no reason.
gollark: Ugh, I'll just use webpack and make myself suffer probably more.

See also

References

  1. "Project Layout". Federal Electricity Commission. Archived from the original on 28 September 2011. Retrieved 9 July 2011.
  2. Cruz, Patricia (11 November 2012). "Inauguración de la presa La Yesca". SDP Noticias. Retrieved 6 February 2013.
  3. "UPDATE 2-Mexico's ICA wins $768 mln La Yesca dam deal". Reuters. 6 September 2007. Retrieved 9 July 2011.
  4. "Background". CFE. Archived from the original on 28 September 2011. Retrieved 9 July 2011.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.