Jefferson County Courthouse (Texas)

The Jefferson County Courthouse in Beaumont, Texas is one of the tallest courthouses in the state, and is an excellent example of Art Deco architecture. Built in 1931, it is the fourth courthouse built in Jefferson County. It was designed by Fred Stone and Augustin Babin, and is thirteen stories high. In 1981, an annex was added to the west side of the courthouse.

Jefferson County Courthouse
Texas State Antiquities Landmark
Jefferson County Courthouse
Jefferson County Courthouse
Jefferson County Courthouse
Location1149 Pearl St.
, Beaumont, Texas
Coordinates30°4′44″N 94°5′36″W
Area2 acres (0.81 ha)
Built1931 (1931)
ArchitectFred C. Stone, Augustin Babin
Architectural styleArt Deco
NRHP reference No.82004509[1]
TSAL No.8200000394
Significant dates
Added to NRHPJune 17, 1982
Designated TSALJanuary 1, 1992

History

The Jefferson County Courthouse and Annex. The Port of Beaumont in the background.

The county has had four courthouses. The first building built by the county was a simple wood structure built to serve as the county jail. The second courthouse was built in 1854 and was a simple two story square structure. A third courthouse, a three-story red brick building designed by E.T. Heiner, was built in 1893. By the late 1920s Beaumont had grown so much that the courthouse was inadequate to meet the needs of the people, and by early 1931 the present brick structure was completed. The architects were Fred C. Stone & A. Babin; the sculptor of the frieze panels and other architectural sculpture was Beaumont sculptor Matchett Herring Coe.

The building has retained nearly all of its originality over the years, including its marble interior, but in 1981 an annex was added to the west side to increase space. The annex connects to the original courthouse through the basement, first, and second floors. The only public entrance is through the annex due to recent security upgrades.

Floors eight through thirteen of the courthouse once served as the county jail, one can tell by the barred windows. Today the space is used for storage.

Restoration

A $22 million restoration project is currently underway. Phase one was completed in May 2009 when the copper roof from the 1940s was replaced with a multicolored tile roof, similar to the original. Phase two began August 2010, and will clean and restore granite and windows from the fifth to 13th floor.

Images

gollark: Why don't *you* work on potatOS?
gollark: That looks pretty evil.
gollark: *adds code to `load` function in most bodgey way possible preventing that from working*
gollark: ```luaif _G.potatOS then error "potatOS is unsupported" end```
gollark: It's things like this which make PotatOS with MBS the best available experience, until squid adds code making it break on potatOS.

See also

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.