Gilgel Gibe River

Gilgel Gibe River (with Gilgel meaning Little) is a major tributary of the larger Gibe River in southwest Ethiopia in western Oromia Region. It flows in an arc through the south of the Jimma Zone, defining part of the Zone's boundary with that of the Southern Nations, Nationalities, and Peoples' Region as it turns north. It then joins the eastwards flowing Gibe River less than ten miles from its own confluence with the Omo River.

Hydroelectric potential

Plans to develop the hydroelectric potential of the Gilgel Gibe river were first announced in the 1980s.

Construction of the Gilgel Gibe I Power Station started in 1986 and was completed in 2004, after being interrupted in the early 1990s. The plant includes a reservoir of about 0.917 cubic kilometers created by a dam about 40 meters high. The Gilgel Gibe river flows are returned to the natural river bed after having transformed the energy of the water into electricity through a powerplant equipped with three Francis turbines.

The resettlement program required moving about 3,000 people to new areas including the people living under or near the power line connecting the power plant to Addis Ababa.[1] Employing 307 expatriates from 32 countries and 4,015 local people, the plant was completed at a cost of about two billion birr and became Ethiopia's largest power plant at that time, with a capacity of 184 megawatts.[2]

The second phase of the development of the Gibe-Omo hydropower potential started with the Gilgel Gibe II Power Station on the Omo River. The flows of the Gilgel Gibe River, regulated by the Gilgel Gibe I Dam, are conveyed through a 26 km long hydraulic tunnel through the Fofa mountains to the Omo River in the neighboring river valley downstream of the Gilgel Gibe I. The plant, that produces about 420 MW did not require resettlements. This second phase was 97.5% complete in August 2009 and was scheduled for commissioning on September 2009 onwards.[3]

gollark: I did NOT know you could do what #3 does with identifiers. Unless I wrote that and I actually do.
gollark: I'm glad that the clearly highly intelligent author of #11 recognizes the glory of SQLite3.
gollark: I mean, in practical use you'd just do `sorted`, so they somewhat have to be.
gollark: The palaiologosimulatorâ„¢ as previously described is not very dynamic, an economy, or hyperrealistic.
gollark: It's unrealistic.

References

  1. "Gilgel Gibe Resettlement Project in Ethiopia". Archived from the original on November 12, 2004. Retrieved 2007-02-01.
  2. "New Hydroelectric Power Plant in Gilgel-Gibe Inaugurated by Prime Minister Meles Zenawi" (accessed 22 April 2006)
  3. "New Hydroelectric Power Plant on Gilgel Gibe" (All Africa), subscription required; accessed 21 July 2006

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.