Forum Groningen

Forum Groningen is a cultural center in the city of Groningen in the northern Netherlands that houses a library, cinema, and parts of the Groninger Museum. Forum Groningen opened in November 2019, and is expected to receive 1.6 million visitors annually.

Forum Groningen
Forum Groningen in March 2019
General information
StatusCompleted
TypeCultural center
LocationHereplein 73, Groningen
CountryNetherlands
Coordinates53°13′7.70″N 6°34′12.85″E
Construction started31 October 2012 (2012-10-31)
Opened29 November 2019 (2019-11-29)
Cost140 million
Height45 meters (148 feet)
Technical details
Structural systemReinforced concrete and steel
Floor count10 + 5 subterranean parking
Floor area17,000 m2 (183,000 sq ft)
Design and construction
Architecture firmNL Architects Amsterdam
Main contractorRoyal BAM Construction
Website
www.forum.nl/en

The center was is located next to the Great Market Square and the New Market and is part of larger reconstruction plans of the Great Market Square's eastern side.

History

Planning

The eastern side of Groningen's Great Market Square was destroyed in World War II. It has subsequently been rebuilt, but its facade has since lost appeal. Municipal authorities initiated plans for its redevelopment in 2005, but met heavy opposition from the city council. A plebiscite was held on 29 June, inviting inhabitants to weigh in. Although 53% of the votes were favorable, results were voided due to a turnout of only 38.5%.[1]

Architects were invited to enter an architectural design competition, allowing the city's inhabitants to put together a top three out of a total of seven designs, from which the Forum's winning design was chosen by a municipal council.

Construction

Construction costs were projected to be around 71 million, of which €35 million was paid by the provincial government. Provincial authorities attempted to back out of the project in 2010; threats of legal action led by Jan Terlouw secured its renewed support.[2] Work to demolish the site's original development—a shopping center and a student association building—began in September 2011.[3] The building was slated for completion in 2017, allowing for six years' of construction. However, decades' worth of large-scale drilling in the Groningen gas field has led to an increase in induced earthquakes in the province, whose event count shows an exponential growth in time, and caused a budget overrun and construction to run overdue for two years, as new plans had to be drafted to ensure the building's earthquake-resistance.[4]

The building had its official opening on 29 November 2019.

gollark: How many?
gollark: Using some arbitrage I can buy them off him for 30KST each, though.
gollark: Lemmmy's got 200 lasers.
gollark: If someone left a computer in the wild with no sign of stuff around it, how are you meant to know who owns them?!
gollark: Ah, better days...

References

  1. Hoogers, M.; Tops, P. W. (2005). Hoe het referendum werd gewonnen: een evaluatie van het Groninger referendum van 29 juni 2005. Tilburg School for Politics and Management.
  2. "Groninger Forum gaat er komen". RTV Noord. 6 July 2011.
  3. "Werkzaamheden Forum van start". RTV Noord. 29 August 2011.
  4. "Twee jaar te laat en dubbel zo duur" (in Dutch). NOS. 29 November 2019. Archived from the original on 30 November 2019. Retrieved 23 January 2020.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.