Fort William Junction

Fort William Junction is a railway junction on the West Highland Line in Scotland, located to the east of Fort William railway station. It is where the railway to Mallaig connects with the Glasgow to Fort William railway.

A crossing loop exists on the Mallaig line immediately beyond the junction but there has never been a facility for crossing trains on the main West Highland Line in the vicinity of the junction.

History

Originally named "Banavie Junction", the junction was formed on 1 June 1895 when a short branch line to Banavie Pier was opened.[1] The branch left the West Highland Railway approximately one mile east of Fort William station.

The junction was renamed "Mallaig Junction" on 30 March 1901, when the Mallaig Extension Railway opened.[2] The former name "Banavie Junction" was however transferred concurrently to a new junction formed where the Mallaig railway left the existing branch to Banavie Pier. On 27 March 1988, the junction assumed its present name, "Fort William Junction", to avoid potential confusion with "Mallaig" in radio communications.

Lochaber Narrow Gauge Railway

The Pier Railway of the Lochaber Narrow Gauge Railway originally crossed over the West Highland Railway and the Mallaig Extension Railway on separate bridges to the east of Mallaig Junction. Construction of a realigned Pier Railway, avoiding the site of Inverlochy village, commenced in 1927. It crossed the West Highland Railway on a bridge immediately west of Mallaig Junction. This bridge is still in situ but devoid of track following the complete closure of the narrow gauge line.

Signalling

From its opening in 1894, the West Highland Railway was worked throughout by the electric token system. Banavie Junction signal box (as originally named) opened on 6 August 1894.[3] The signal box is located in the vee of the junction and remains operational today. It has been renamed twice during its existence, in line with the junction itself.

The present lever frame, with 30 levers, dates from 1973. An 'NX' (entrance-exit) panel was added in 1975 to control the signalling at the relocated Fort William station. At the same time, the single line between the junction and the station became worked under Track Circuit Block regulations.

Before the introduction of Radio Electronic Token Block (RETB) to the West Highland Line, Mallaig Junction signal box worked to Spean Bridge and Banavie Canal Bridge signal boxes on the routes towards Glasgow and Mallaig respectively. RETB was commissioned by British Rail between Mallaig Junction and Mallaig on 6 December 1987 and between Fort William Junction and Upper Tyndrum on 29 May 1988. As a consequence, Fort William Junction S.B. now works only to Banavie Signalling Centre, on both routes.

gollark: And the entire antimemetics division storyline.
gollark: I have read a *significant* fraction of the series VI SCPs.
gollark: I think I know more SCP™ than you.
gollark: You can convert lead to gold if you remove 3 protons, normally by shoving neutrons at it or something.
gollark: No, you can do it.

References

  1. Thomas, John (1984). The West Highland Railway. Newton Abbot: David & Charles. ISBN 0-946537-14-3.
  2. The Register of Scottish Signal Boxes, F Alexander & E S Nicoll (1990).
  3. The Register of Scottish Signal Boxes, F Alexander & E S Nicoll (1990).

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.