Five Ways tram stop
Five Ways is a proposed tram stop serving Five Ways, Birmingham, on the extension to Edgbaston of Line 1 of the Midland Metro. It is planned to be located on Broad Street. It is presently planned to be opened by 2021, as part of the third phase of the Birmingham extension of Line 1, after the New Street to Centenary Square extension has been finished. Funding has been earmarked for the extension.[1][2][3]
Five Ways | |
---|---|
Midland Metro tram stop | |
Map of the future extension, showing position of the stop. | |
Location | Five Ways - Broad Street, Birmingham Birmingham England |
Line(s) | Line 1 (Birmingham – Wolverhampton) |
Platforms | 2 |
History | |
Opening | 2021 proposed |
Traffic | |
Passengers | N/A |
The proposed stop would be a few hundred metres away from the existing Five Ways railway station.
Preceding station | Following station | |||
---|---|---|---|---|
After 2017 | ||||
Brindleyplace | Line 1 | Edgbaston |
References
- "Midland Metro Grand Central extension opens". British Trams Online. Retrieved 10 June 2016.
- "Birmingham New Street tram extension opens". Rail News. Retrieved 10 June 2016.
- "Archived copy" (PDF). Archived from the original (PDF) on 29 July 2014. Retrieved 17 October 2015.CS1 maint: archived copy as title (link)
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.