Farm to Market Road 2546

Farm to Market Road 2546 (FM 2546) is a state highway in the U.S. state of Texas that stays within Wharton County. The two-lane road starts at Mount Pilgrim Baptist Church and goes directly west past FM 1160 and State Highway 71 (SH 71). East of SH 71, the highway turns sharply to the southwest and ends at SH 71 north of El Campo.

Farm to Market Road 2546
Route information
Maintained by TxDOT
Length13.051 mi[1] (21.004 km)
ExistedOctober 31, 1958 (1958-10-31)[1]–present
Major junctions
East endCounty Road 394 at Mount Pilgrim Church
  FM 1160 at Hahn
SH 71
FM 2765
West end SH 71 north of El Campo
Location
CountiesWharton
Highway system
RM 2545FM 2547

Route description

FM 2546 starts at a rural intersection in front of Mount Pilgrim Baptist Church. The paved highway ends at this location. From here, gravel-topped County Road 394 continues west and another gravel road goes north. From the church east to FM 1160 at the site of Hahn is 3.3 miles (5.3 km). The distance from FM 1160 eastward to SH 71 is 4.2 miles (6.8 km). The Hahn Cemetery is on the south side of the road along this stretch of FM 2546. Continuing east of SH 71, the highway passes through the tiny community of Jones Creek. At a distance of 2.3 miles (3.7 km) east of SH 71, FM 2546 turns sharply to the southwest. After going southwest an additional 2.3 miles (3.7 km) the highway comes to the intersection with FM 2765. Continuing to the southwest for 1.0 mile (1.6 km), FM 2546 ends at a stop sign on SH 71. The continuation of the road on the west side of SH 71 is called Sandy Corners Road.[2]

History

FM 2546 was originally designated on October 31, 1958 to start at FM 1160 and run approximately 4.3 miles (6.9 km) eastward to a point on SH 71 which was 1.7 miles (2.7 km) southeast of New Taiton in Wharton County. On May 2, 1962 the highway was extended west from FM 1160 about 3.5 miles (5.6 km), making a total distance of approximately 7.7 miles (12.4 km). On May 5, 1966, FM 2546 was extended east from SH 71 a distance of about 2.4 miles (3.9 km). From this point, the highway followed 3.3 miles (5.3 km) of the former right-of-way of FM 2923 to end at SH 71 at a location 2.2 miles (3.5 km) north of the El Campo city limit.[1] FM 2923 was canceled on May 18, 1966.[3]

Major intersections

The entire highway is in Wharton County.

LocationmikmDestinationsNotes
Pin Oak0.00.0County Road 394Western terminus of FM 2546
Hahn3.35.3 FM 1160 Louise, New Taiton
7.512.1 SH 71 El Campo, Garwood
12.119.5 FM 2765 El CampoNorthern terminus of FM 2765
13.121.1 SH 71Eastern terminus of FM 2546
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
gollark: Or Brain[REDACTED].
gollark: I think the most portable interpreted language by now is *probably* WebAssembly or JS?
gollark: You can make a C interpreter if you want to.
gollark: It can be ish via WASM.
gollark: *Can* you cross-compile aßembly?

See also

  •  Texas portal
  •  U.S. Roads portal

References

  1. Transportation Planning and Programming Division (n.d.). "Farm to Market Road No. 2546". Highway Designation Files. Texas Department of Transportation. Retrieved June 23, 2013.
  2. Google (June 23, 2013). "Farm to Market Road 2546" (Map). Google Maps. Google. Retrieved June 23, 2013.
  3. Transportation Planning and Programming Division (n.d.). "Farm to Market Road No. 2923". Highway Designation Files. Texas Department of Transportation. Retrieved June 23, 2013.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.