Eastern Mediterranean Optical System 1

The Eastern Mediterranean Optical System (EMOS-1) is a fiber optic cable linking Palermo, Italy with Lechaina, Greece; Marmaris, Turkey and Tel Aviv, Israel, which was created in Turkey in 1991. Consisting of three pairs which are split en route through branching units. The ship CS Vercors laid the cable.[1] Each pair of fibres are capable of transmitting 1920 telephone calls in each direction.

History

In November 1990, the undersea cable EMOS-1, connecting Israel with Turkey, Greece and Italy, was deployed. This was the first Israeli-built undersea cable,[1] and was augmented by CIOS in April 1994. Since then, other cables have been laid which have provided large capacity links between Israel and abroad.

gollark: no eggs no eggs no eggs no eggs no eggs only please read this help me
gollark: The AP looks a bit weird without hour markers.
gollark: NO EGGS NO EGGS NO EGGS NO EGGS HATCHLINGS ONLY PLEASE READ THIS PLEASE HELP ME
gollark: ```Wants: CB. W: 2 nice lineaged/CB red hatchies.```The thing there is a prize. I think they may have the wrong thing up or something.
gollark: I got 3 ER CB hatchlings including a BSA one for a CB purple siyat.

See also

References

  1. Conneally, Tim (August 10, 2012). "Legendary Fiber Optic Cable Ship Burns to a Crisp on Skeleton Coast". Betanews. Retrieved August 11, 2012.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.