Darley Dale railway station

Darley Dale railway station is a railway station on the heritage line Peak Rail.

Darley Dale
Darley Dale Station, 1990s
Location
PlaceDarley Dale
AreaDerbyshire Dales
Coordinates53.1601°N 1.5937°W / 53.1601; -1.5937
Operations
Original companyManchester, Buxton, Matlock and Midland Junction Railway
Pre-groupingMidland Railway
Post-groupingLondon, Midland and Scottish Railway
Operated byPeak Rail
Platforms2
History
4 June 1849 (1849-06-04)Opened as Darley
1 October 1890Renamed Darley Dale
6 March 1967Closed
1991Reopened in preservation
Stations on heritage railways in the United Kingdom
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z

History

Lying at the bottom of Station Road in the settlement of Darley Dale, Darley Dale in its current form is not the first station to have existed upon the site. That halt was built in 1849, by the Manchester, Buxton, Matlock and Midlands Junction Railway, and existed on the other side of the level crossing. The present structure dates back to 1873, and at one time the station possessed both a footbridge and a goods yard.

The station survived into the British Rail era but succumbed to the round of closures that followed the Beeching Report of 1963, services ending on 6 March 1967. The line itself was then closed on 1 July 1968 and the track was subsequently removed. The station reopened in its current guise in 1991, as a result of the efforts of heritage and preservation group Peak Rail. Since then, the latter have run heritage steam services on the former London, Midland and Scottish Railway route to both Matlock and since 1997, to Rowsley South.

Present day

Darley Dale Station in June 2007, looking northward

Both platforms are now in use by Peak Rail. The station building on the Up platform contains an exhibition and waiting room, other facilities at the location include toilets with disabled access and parking for a small number of cars. Tickets must be purchased on the train however, as there is no longer a dedicated ticket office at this location.

In its latterday BR guise, the signal box was located on the south side of the level crossing (up side) and there was a lattice footbridge immediately north of the crossing. The signal box disappeared after closure and the footbridge was eventually removed for use on a heritage railway. Under Peak Rail auspices, a signal box (originally at Bamford but relocated from the erstwhile Buxton steam centre) was sited at the southern end of the Up platform (see pictures), with a level crossing (Station Road) just beyond it. This signal box was merely of cosmetic use, with the crossing controlled by a crossing keeper's hut at road level (located on the Down side, and across the road from the station). In March 2008, the crossing keeper's hut was replaced by a more extensive new structure built in a traditional style, required as part of the increased signalling equipment on the railway. The latter has, in effect, split the operation into three controlled sections, permitting better timetabling and more efficient services, while also providing the necessary infrastructure to cater for extensions to the present line. The raised signal box was dismantled on 14 January 2014, the upper half being removed for further use at Rowsley, the lower section being judged unfit for further use and dismantled. As the original footbridge has subsequently been re-acquired and returned, the plan is that it will take its old position in due course.

Darley Dale also possesses one small yard, at the south end of the station. Previously used to stable small amounts of rolling stock and locomotives, it has now been cleared pending a full-scale refurbishment of the life-expired facilities. In June 2013, agreement was reached for a locomotive maintenance/restoration building for the Andrew Briddon Loco collection to be built there, with foundations commencing in January 2014. The yard is not open to the public. Darley Dale also used to have a yard at the north end for the station, though this was completely removed over the 2012-2013 winter period.

gollark: I even fixed some of them.
gollark: PotatOS has so many bugs it's somewhat funny.
gollark: You, or someone else, has to explicitly specify in detail what exactly you want, in Lua, and then spend a while debugging it because you probably got it wrong.
gollark: It's not a matter of there just being magic commands to make the computer do exactly what you want.
gollark: That seems like a dodecahedral attitude.
Preceding station   Heritage railways Following station
Matlock   Peak Rail   Rowsley South
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.