Dalešice Hydro Power Plant

Dalešice Hydro Power Plant on the Jihlava River is a large power plant in the Czech Republic that has four Francis turbines with a nominal capacity of 120 megawatts (160,000 hp) each[1] and a total capacity of 480 megawatts (640,000 hp). The old turbines before the 1999–2007 reconstruction had a capacity of 112.5 megawatts (150,900 hp) each. The plant includes the lower Dalešice-Mohelno Dam.

Dalešice Reservoir
Dam with pumped-storage plant
LocationTřebíč District
Coordinates49°07′30″N 16°07′17″E
Typereservoir
Primary inflowsJihlava River
Primary outflowsJihlava River
Basin countriesCzech Republic
Surface area480 hectares (1,200 acres)
Max. depth85.5 m (281 ft)
Water volume127.3×10^6 m3 (4.50×10^9 cu ft)

Dalešice Dam

Dalešice Dam lies in the Czech Republic. It was built between 1970 and 1978 together with the Mohelno Dam as a water source for the nearby Dukovany Nuclear Power Station. As it has the fastest-starting turbines of all dams in Czech republic (less than 1 minute to full power) it also acts as emergency source in case some of the reactors in Dukovany shut down (for that reason it was also initially equipped with total capacity of 450 MW to back-up one of the four 440MWe VVER440 reactors). Thanks to the turbine capability to act as pumps it also plays significant balancing role for distributing network when it pumps water back to the higher reservoir during the night, and uses it again to produce electricity during the daily consumption peaks. The gravity dam is 100 metres (330 ft) high (the highest in the Czech Republic, second-highest rockfill dam in Europe), so the reservoir is also the deepest in the Czech Republic 85.5 metres (281 ft). The reservoir has a capacity of 127.3 million cubic metres (4.50×10^9 cu ft).

Mohelno Dam

The Mohelno Dam is through-flow dam, acting as the lower reservoir of the Dalešice-Mohelno pump-dam complex. The gravity concrete dam is 185 metres (607 ft) long, 7.75/32 m wide and 38.65 m tall. It creates 7-km-long lake and has total capacity of 17.1 million cubic metres (600×10^6 cu ft). It includes single Kaplan turbine (1.2 MW) and single Francis turbine (0.6 MW). In case of total blackout, the Mohelno turbines can jumpstart the Dalešice Francis turbines and together start the Dukovany NPP. Thanks to this the whole Dalešice-Dukovany complex is certified for fully autonomous operation independent of the external distribution network.

gollark: "Rational" implies we have some sort of clear goal and are trying to optimize for that.
gollark: https://en.wikipedia.org/wiki/List_of_cognitive_biases
gollark: ... no.
gollark: Failure mode = way it can fail.
gollark: (yes, including me)

References


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.