Chandrapur–Padghe HVDC transmission system

The Chandrapur–Padghe HVDC transmission system is an HVDC connection[1] between Chandrapur and Padghe (near Mumbai) in the state of Maharashtra in India, which was put into service in 1999.

Chandrapur–Padghe HVDC transmission system
Location
CountryIndia
StateMaharashtra
Coordinates20°00′36″N 79°17′06″E
19°21′26″N 73°11′18″E
FromChandrapur
ToPadghe, near Mumbai
Ownership information
OwnerMaharashtra State Electricity Board
Construction information
Installer of substationsABB, Bharat Heavy Electricals Limited
Commissioned1999
Technical information
Typeoverhead line
Type of currentHVDC
Total length752 km (467 mi)
Power rating1,500 MW
DC voltage±500 kV
No. of poles2

It connects the coal-fired Chandrapur Super Thermal Power Station to the major load centre of Mumbai. The project has a 752 kilometres (467 mi) long bipolar overhead line. The transmission voltage is ±500 kV and the maximum transmission power is 1,500 megawatts. The scheme uses thyristor valves, arranged in a single twelve pulse bridge per pole. The project was built by ABB and BHEL, and is owned by Maharashtra State Electricity Board (MSEB).

The eastern (Chandrapur) converter station is located 20 kilometres (12 mi) from the Chandrapur back to back HVDC station. The close proximity of the two converter stations meant that the control systems needed to be carefully coordinated, a task made more challenging by the fact that the two stations were built by different manufacturers. To address this problem a series of joint simulation studies, involving the control equipment from both converter stations connected to a common simulator, was performed.[2]

Sites

SiteCoordinates
Chandrapur converter station20°00′36″N 79°17′06″E
Padghe converter station19°21′26″N 73°11′18″E
gollark: It also seems like a terrible protocol, design-wise.
gollark: I started actually doing backups instead of just having replicated copies of things recently, and I have something like 150GB of them.
gollark: The whole UPnP thing seems hilariously convoluted and bad and I don't know why they did it this way.
gollark: HTTPS is HTTP over TLS, it's not using HTTP as a lower level transport.
gollark: No it isn't.

See also

References

  1. Adhikari, T., Isacsson, G., Ambekar, V.D., The Chandrapur-Padghe HVDC Bipole Transmission, CIGRÉ Symposium on HVDC, Kuala Lumpur, Malaysia, September 1999.
  2. Abbott, K.M., Aten, M., Two HVDC schemes in close proximity: a coordination study, CIGRÉ Session, Paris, 2000, paper reference 14-109.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.