Chander railway station

Chander railway station is a railway station of Bankura-Masagram line under the Adra railway division of South Eastern Railway zone. It is situated at Rampur, Godardihi, Chander in Bankura district in the Indian state of West Bengal.[1]

Chander railway station
Indian Railway
LocationRampur, Chander, Bankura district, West Bengal
India
Coordinates23°18′11″N 87°15′02″E
Elevation86 metres (282 ft)
Owned byIndian Railways
Operated bySouth Eastern Railway
Line(s)Bankura-Masagram line
Platforms1
Tracks1
Construction
Structure typeStandard (on ground station)
ParkingNo
Other information
StatusFunctioning
Station codeCNRF
Division(s) Adra railway division
History
Opened1916
Closed1995
Rebuilt2005
Electrified2018-19
Previous namesBankura Damodar Railway
Services
Preceding station   Indian Railway   Following station
South Eastern Railway zone
Bankura-Masagram line

History

Old narrow gauge Bankura–Damodar Railway (also called as Bankura Damodar River Railway) connecting Bankura and Rainagar in Bankura and Bardhaman districts was opened to traffic in sections between 1916–1917.[2] In 2005, the 118 kilometers long railway section known as Bankura–Masagram line was converted to 1,676 mm (5 ft 6 in) broad gauge.[3] The whole track including Chander railway station was electrified in 2018–19.[4][5]

gollark: I want one to replace my ailing existing phone (it runs an outdated Android version with no hope of support, the battery's degraded horribly and is not easily replaceable, and earlier today it randomly rebooted), but they're not being produced now or something.
gollark: Oh, that.
gollark: Which is two.
gollark: There's the PinePhone and Librem 5.
gollark: There are... two GNU/Linux phones, but none with keyboards.

References

  1. roy, Joydeep. "Chander P.H. Railway Station Map/Atlas SER/South Eastern Zone - Railway Enquiry". indiarailinfo.com. Retrieved 2019-06-10.
  2. "Bankura's Iron Horses". Retrieved June 10, 2019.
  3. "Indian Railway History Time line". Archived from the original on July 14, 2012. Retrieved June 9, 2019.
  4. "Electrification of Masagram-Bankura stretch to cut travel time". business-standard.com. Retrieved June 10, 2019.
  5. "Electrification of Railway Track". railnews.in. Retrieved June 10, 2019.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.