Brandon Generating Station is a natural gas-fired power station owned by Manitoba Hydro, located in Brandon, Manitoba, Canada. The station was first built to burn lignite from Saskatchewan.
Brandon Generating Station | |
---|---|
Natural-gas fired combustion turbine building at Brandon GS | |
Country | Canada |
Location | Brandon, Manitoba |
Coordinates | 49°50′43″N 99°53′21″W |
Status | Operational |
Commission date | 1958 |
Owner(s) | Manitoba Hydro |
Thermal power station | |
Primary fuel | Natural gas |
Turbine technology | Steam turbine Gas turbine |
Power generation | |
Nameplate capacity | 340 MW |
On 1 January 2010 Unit 5, the sole coal-fired unit, was downgraded to emergency use only, per section 16 of the Manitoba Climate Change and Emissions Reductions Act.[1][2] Unit 5 was permitted to operate as a generator only under certain circumstances:[3]
- To prevent a situation which would lead to a disruption or destabilization of the power supply.
- In drought years where demand exceeds forecasted supply.
- To maintain the generator in a state of readiness and availability.
The last allowance required Unit 5 to operate for 3–4 days each month at 10–15% of maximum capacity.[2] Unit 5 stopped burning coal on August 1, 2018, and was converted to a synchronous condenser.[4]
Description
The station consists of:[5]
- 4 x 33 MW units (In 1996 three units were retired while the remaining unit is used as a synchronous condenser)
- 1 x 110 MW coal-fired unit.
- 2 x 120 MW Alstom natural gas units (installed in 2002).
gollark: Kidnapping me is especially mean.
gollark: Unless you interpret me bringing it up as me secretly trying to manipulate you into considering it, but that would be silly.
gollark: Why would I be there?
gollark: I feel like I've been very clear about this.
gollark: No, as this would involve mean, and is thus impossible.
References
- "Manitoba Climate Change and Emissions Reductions Act". Archived from the original on 2011-11-23. Retrieved 2011-06-15.
- "Brandon Generating Station – Unit 5 Environmental Impact Statement Volume 5 – Amendments to Manitoba Hydro's Environment Act Licence Review Submission" (PDF). Archived from the original (PDF) on 2011-08-18. Retrieved 2011-06-15.
- Coal-Fired Emergency Operations Regulation "Archived copy" (PDF). Archived from the original (PDF) on 2012-03-18. Retrieved 2011-06-15.CS1 maint: archived copy as title (link)
- Abigail Turner, "Manitoba no longer using coal for power," Global News, January 9, 2019
- "Plant Description". Archived from the original on 2012-12-05. Retrieved 2010-03-28.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.