Austin Energy

Austin Energy is a publicly owned utility providing electrical power to the city of Austin, Texas and surrounding areas. Established in 1895, the utility is a department of the City of Austin and returns its profits to the city's general fund to finance other city services. Austin Energy is the United States' 7th largest public utility, serving more than 500,000 customers and more than one million residents (as of 2019) within a service area of approximately 437 square miles (1,130 km2), including Austin, Travis County and a small portion of Williamson County.[1]

Austin Energy
Public utility
IndustryElectric power
Founded1895 (1895)
HeadquartersAustin, Texas
Area served
Travis & Williamson counties, Texas
OwnerCity of Austin
Websiteaustinenergy.com

Energy generation

Austin Energy’s total generation capacity is more than 3,000 megawatts (MW), provided by a mixture of wind power, solar power, biomass, natural gas, nuclear power, and coal.[2] All of Austin Energy's generation is sold into the ERCOT wholesale market; all of the retail load is served by purchasing power from ERCOT.[3]

Generation assets

Austin Energy owns and operates two natural gas-fired power plants in the Austin area: the Decker Creek Power Station and the Sand Hill Energy Center. The utility also owns 50% of units 1 and 2 at the coal-fired Fayette Power Project in La Grange and 16% of the South Texas Nuclear Project in Bay City (near Houston).[2] The STNP was the subject of a binding citizen referendum (November 3, 1981) to sell Austin's part in the project. STNP went online in 1986. No council has sold Austin's STNP telling citizens that "no one wanted our 16 percent".

Unit[2]FuelCapacity (MW)Construction Year
Decker Creek Power Station (Austin)Gas9271967–1978
Fayette Power Project (La Grange, 50% Share)Coal6021979–1980
Robert Mueller Energy Center (Austin)Gas4.62006
Sand Hill Energy Center (Del Valle)Gas5702001–2010
South Texas Project (Bay City, 16% Share)Nuclear4361988–1989

Renewable energy

As of July 2014, renewable energy represented roughly 23% of Austin Energy's generation portfolio, which included wind, solar, landfill methane and biomass projects.[4] The utility's 2014 generation plan indicated that it aimed to produce 50% of power from renewable sources and 75% from carbon-free sources by 2025.[5] Since that time, new green energy generation assets have rapidly been brought online. As of August 2019, green energy had jumped to 43% of Austin Energy's generation mix, including 1.219 gigawatts (1,219 MW) of operational wind generation and 644.6 MW of currently operational solar power.[6]

Renewable Resources[4]Fuel TypeInstalled Capacity (MW)First Operation YearContract Expiration Date
Sunset FarmsLandfill Methane419962021
Tessman Road LandfillLandfill Methane7.820032017
Nacogdoches PowerBiomass10020122032
Webberville Solar ProjectSolar3020112036
Roserock Solar 157.5 2016 2036
East Pecos (Bootleg) Solar 118.5 2017 2031
Upton County (SPTX12B1) Solar 157.5 2017 2042
La Loma Community Solar Solar 2.6 2018 2043
Waymark Solar 178.5 2018 2043
Whirlwind Energy CenterWind59.820072027
Hackberry Wind ProjectWind165.620082023
Los Vientos IIWind201.620132037
WhitetailWind92.320132037
Los Vientos IIIWind20020152040
Jumbo RoadWind299.720152033
Los Vientos IVWind20020162041

On April 23, 2019, Austin Energy reached an agreement to purchase the Nacogdoches biomass facility for $460 million. Since Austin Energy entered into the 20-year Power Purchase Agreement with the biomass facility the price of natural gas has come down significantly. The purchase – one of Austin's single largest purchases ever [7] – is anticipated to allow the city to avoid $275 million in additional costs.[8]

Energy conservation

Austin Energy operates an energy efficiency program for customers, including a free energy audit that helps to identify ways users can reduce power consumption. The utility offers various subsidies and rebates for efficiency improvements, including HVAC, insulation, efficient lighting, and photovoltaic panels.[9]

In 1992 Austin Energy developed the nation's first local Green Building program.[10] It shares the distinction of being the largest and best established green building program in the country along with Built Green Colorado in Denver.[11]

Electric vehicle program

Austin Energy’s Plug-In EVerywhere network, powered by 100% renewable energy, expanded to 186 public charging stations to help drive a two-year, 300% Austin EV growth rate. Austin Energy led a 10-county, regional effort to develop a community plan that supports the adoption of EVs and successfully deployed the first-of-its-kind EV home charging Demand Response program.

gollark: Unlikely. x86 is CISC, RISC-V is... RISC.
gollark: btw I use risc-v on a carbon nanotube FET processor
gollark: by the way i partake in usage of the arch distribution of gnu/linux
gollark: Worse.
gollark: no u.

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.