Introduction

  1. CGBTxCxbSqsoCUAL
    • Docking via 3 pcs. connectors sliding sideways into the laptop.

    • Power connector used is the square type.

    • Keep track of where the screws are located, because there are many.

    • Be careful on disassembly. The dock is partly mechanical, and it relies on springs and flexing of mechanical parts to function.

  2. dnAp3hps2TE5eHI6
    • Check if the firmware is updated. In this case, the repair may not be needed. The dock needs to be powered and laptop docked when running the update tool.

    • Firmware update tool : Firmware for ThinkPad Ultra/Pro/Basic Docking Station V3.3.1

    • https://pcsupport.lenovo.com/dk/da/produ...

  3. mStBMK3ysqlbPbdU
    • Remove the 8 bottom screws circled in red.

  4. xAI2UvNKlMsXTIHo
    • Remove the 5 screws circled in red from the side of the dock.

    The two hex heads by the VGA connector do not have to be removed at this point. It's much easier to get a nutdriver on them after the plastic cover is removed, you just have to lift that section of the plastic cover over the hex heads when removing the plastic cover.

    Richard Ekblaw -

  5. RrvNjhloVrQlhNVd
    RrvNjhloVrQlhNVd
    hwdZlR2FqGUVYkcg
    • Use plastic picks or a metal spudger to pry off the top left corner of the shown cover. Remove the hidden screw.

    • Lock engaged (LED on). The switch is located inside the button assembly.(when the slider is moved right).

    • Laptop connected/detected: LED on.

    • Screw for removing the key-lock. No need for removal if the whole button assembly is to be removed together.

  6. rfJvo564luyRTI1j
    • Hidden screw under the ThinkPad logo.

    • I recommend peeling off only part of the logo as needed so reassembly of the logo is easy.

  7. PU1LPa62YoxFFVan
    • Pry off the bezel around the key-lock. Remove the screw that connects the button assembly and the bottom assembly.

    Removing the bezel is quite the challenge, the 3 tabs holding the bezel to the plastic button cover are strong. I got it off without breaking any of the tabs, but I put several mars on the button cover in the process.

    Richard Ekblaw -

  8. nZcQbZmrRwOoh2Ko
    • Use plastic picks or a metal spudger to pry off the top covers of the two screws on the top side.

  9. chTRmSkTvIZ5UuK4
    • Button assembly separated. The docking connectors are visible.

  10. UCqdHemX6skACBXv
    • PCB top side

    • Red boxes : Dual Synchronous, Step-Down Controller with 5-V and 3.3-V LDOs. Texas instruments: TPS51225

    • Left step down produce 5V

    • Right step down: produce 3V3 and 5V

    • There are three Eeprom on board : winbond: 25x10CLNIG , 8 pin, U4 and U10 (1M-bit SPI)

    • VLI marked IC: Via labs Usb port controllers VL820. https://www.via-labs.com/product_show.ph...

    • Synaptics VMM5322.Have features for HDMI and 2xDisplay port out.

  11. V6LHZsB5nZKrjLgv
    • PCB bottom side

    • Red boxes : usb-c controller ICs. Via Labs inc, : VP225 - USB Type-C DFP CC Controller

    • Blue box: 2 pcs. cypress CYP3123 USB type C port controller. https://www.cypress.com/part/cypd3123-40...

    • Red arows: 20V path to the laptop usb-c charge power.

Conclusion

To reassemble your device, follow these instructions in reverse order.

Carsten Dahl Hjarup

Member since: 04/11/13

2796 Reputation

0 comments