Kickoff point
| Horizontal Wells: Focus on the Reservoir | |
| |
| Series | Methods in Exploration No. 14 |
|---|---|
| Chapter | Introduction |
| Author | Timothy R. Carr, Erik P. Mason, Charles T Feazel |
| Link | Web page |
| Store | AAPG Store |
The kickoff point (KOP) is the location in a vertical wellbore or inclined section of a slant well where directional drilling operations commence in order to build the wellbore to the design orientation. The KOP defines the beginning of the build curve.
Simple vertical profile of a horizontal well, illustrating basic terms.
This article is a stub. You can help AAPG Wiki by expanding it.
See also
- Bend
- Build rate
- Extended-reach wells
- Geosteering
- Heel
- Horizontal well
- Lateral
- Logging while drilling
- Measurement while drilling
- Multilevel well
- Multilateral well
- Sidetrack
- Toe
- Total measured length
